188 Boulevard de Strasbourg, 93600 Aulnay-sous-Bois

Parcel of 476 m² (recorded area) with 2 buildings (residential), built 1901 – 1949. Planning document zoning: urban zone (U1bAAAAAA).

Recorded area
476 m²
Planning zone
U1bAAAAAAUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

93005 000 CJ 1193005 000 CJ 1293005 000 CJ 1793005 000 CJ 1893005 000 CJ 1993005 000 CJ 2093005 000 CJ 2193005 000 CJ 2293005 000 CJ 2393005 000 CJ 2493005 000 CJ 2593005 000 CJ 2693005 000 CJ 2793005 000 CJ 3093005 000 CJ 3193005 000 CJ 3293005 000 CJ 3393005 000 CJ 3493005 000 CJ 3593005 000 CJ 5893005 000 CJ 6093005 000 CJ 6193005 000 CJ 13293005 000 CJ 14993005 000 CJ 16793005 000 CJ 18793005 000 CJ 18993005 000 CJ 22293005 000 CJ 22393005 000 CJ 23193005 000 CJ 23593005 000 CJ 248
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 103 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
469 m²from the cadastral plan
Perimeter
103 mcomputed from the cadastral plan
Buildings
2 buildingsResidential
Built
1901 – 1949
Height to the eaves
up to 6.7 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

U1bAAAAAA – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200058097_PLUI_20250707

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Aulnay-sous-Bois

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Reinforced urban pre-emption right
Droit de préemption urbain renforcé - Ville de Aulnay-sous-Bois – 100% of the parcel
Transport noise sector
Perimetre de voisinage d'infrastructure de transport terrestre - Categorie 1 – 100% of the parcel
Local advertising rules
Reglement local de publicite – 100% of the parcel
Other information
Alea gonflement des argiles - Moyen – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential
Height to the eaves
up to 6.7 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
1901 – 1949

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Périmètre de risque lié à la dissolution du gypse antéludien dans la commune d'Aulnay-sous-Bois – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
93005 000 CJ 26 (93005000CJ0026)
Commune
Aulnay-sous-Bois (93005)
Prefix
000
Section
CJ
Number
26
Recorded area (contenance)
476 m²
Computed area
469 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200058097_PLUI_20250707)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 93005 000 CJ 25 – 50 Rue de la Marne, 93600 Aulnay-sous-BoisNext parcel: 93005 000 CJ 27 – 152 Boulevard de Strasbourg, 93600 Aulnay-sous-Bois