CarteparcelleMapFrançais

Parcel 92004 000 B 247

Cadastral parcel of 975 m² (recorded area), in Asnières-sur-Seine. Planning document zoning: urban zone (UR6h7).

Recorded area
975 m²
Planning zone
UR6h7Urban zone (U)
92004 000 B 14592004 000 B 15792004 000 B 20892004 000 B 24792004 000 B 24892004 000 B 24992004 000 B 25092004 000 B 25192004 000 B 25492004 000 B 25592004 000 B 25692004 000 B 285
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 288 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
919 m²from the cadastral plan
Perimeter
288 mcomputed from the cadastral plan
Addresses
None linked
Clay soils
Not recorded
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UR6h7 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200057990_PLUI_20260217

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Asnières-sur-Seine

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Parking requirements of the mobility plan
Périmètre de 500m autour de gares structurantes – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Lead exposure risk area
Zone à risque d'exposition au plomb – 100% of the parcel
Local advertising rules
Règlement local de publicité – 100% of the parcel
Development tax sector
Secteur de taxe d'aménagement – 100% of the parcel
Works subject to declaration or permit (demolition, fences, façades)
Zone d'obligation de permis de démolir – 100% of the parcel
Works subject to declaration or permit (demolition, fences, façades)
Travaux sur clôtures soumis à déclaration – 100% of the parcel
Works subject to declaration or permit (demolition, fences, façades)
Ravallement soumis à déclaration – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Not recorded
Risk prevention plan
Natural or mining risk plan (PM1) – PPRi de la vallée de la Seine dans le département des Hauts-de-Seine – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

The parcel in its section

Details

Cadastral reference
92004 000 B 247 (920040000B0247)
Commune
Asnières-sur-Seine (92004)
Prefix
000
Section
B
Number
247
Recorded area (contenance)
975 m² Contenance arpentée (measured on site).
Computed area
919 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200057990_PLUI_20260217)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 92004 000 B 246 – 26 Rue Henri Poincaré, 92600 Asnières-sur-SeineNext parcel: 92004 000 B 248