CarteparcelleMapFrançais

23 Rue Pierre Bourdan, 91420 Morangis

Parcel of 520 m² (recorded area) with a residential building, built 1975 – 1999. Planning document zoning: urban zone (UHmMMMMMM).

Recorded area
520 m²
Planning zone
UHmMMMMMMUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

91432 000 H 19891432 000 H 21091432 000 H 21191432 000 H 21291432 000 H 21391432 000 H 22891432 000 H 23291432 000 H 23391432 000 H 23891432 000 H 23991432 000 H 24091432 000 H 24191432 000 H 24691432 000 H 25991432 000 H 26091432 000 H 26191432 000 H 41891432 000 H 57091432 000 H 58891432 000 H 58991432 000 H 59191432 000 H 70591432 000 H 70691432 000 H 70791432 000 H 71091432 000 H 71191432 000 H 75891432 000 H 76091432 000 H 76391432 000 H 80191432 000 H 80291432 000 H 80391432 000 H 86791432 000 H 86891432 000 H 86991432 000 H 87291432 000 H 116991432 000 H 128391432 000 H 132591432 000 H 134391432 000 H 1344
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 107 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
507 m²from the cadastral plan
Perimeter
107 mcomputed from the cadastral plan
Buildings
1 buildingResidential
Built
1975 – 1999
Height to the eaves
8 m
Storeys
2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UHmMMMMMM – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200058014_PLUI_20251216

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Morangis

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Development guidelines (OAP)
Secteur comportant une orientation d'amenagement et de programmation - OAP stratégique – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Perimetre de droit de preemption urbain – 100% of the parcel
Development tax sector
Secteur de taxe d'amenagement – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
8 m
Storeys
2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
91432 000 H 711 (914320000H0711)
Commune
Morangis (91432)
Prefix
000
Section
H
Number
711
Recorded area (contenance)
520 m²
Computed area
507 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200058014_PLUI_20251216)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 91432 000 H 710 – 21 Rue Pierre Bourdan, 91420 MorangisNext parcel: 91432 000 H 712