CarteparcelleMapFrançais

4 Chemin de la Vène Haute, Puygouzon, 81990 Puygouzon

3 buildings with 3 recorded homes, built 1950 – 1974, on a parcel of 1,380 m² (recorded area). Planning document zoning: urban zone (UM5).

Recorded area
1,380 m²
Planning zone
UM5Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

81218 000 ZL 681218 000 ZL 781218 000 ZL 1081218 000 ZL 1181218 000 ZL 1581218 000 ZL 1681218 000 ZL 8381218 000 ZL 8781218 000 ZL 8981218 000 ZL 10181218 000 ZL 10281218 000 ZL 11581218 000 ZL 14081218 000 ZL 14281218 000 ZL 14381218 000 ZL 14481218 000 ZL 14681218 000 ZL 14781218 000 ZL 14881218 000 ZL 14981218 000 ZL 15181218 000 ZL 15381218 000 ZL 15781218 000 ZL 15881218 000 ZL 17381218 000 ZL 17481218 000 ZL 20981218 000 ZL 21081218 000 ZL 21181218 000 ZL 21281218 000 ZL 21381218 000 ZL 23181218 000 ZL 23981218 000 ZL 24181218 000 ZL 26181218 000 ZL 26281218 000 ZL 26381218 000 ZL 26481218 000 ZL 28081218 000 ZL 28281218 000 ZL 30181218 000 ZL 30281218 000 ZL 30381218 000 ZL 30481218 000 ZL 30581218 000 ZL 30681218 000 ZL 30781218 000 ZL 31581218 000 ZL 31681218 000 ZL 31781218 000 ZL 31881218 000 ZL 31981218 000 ZL 33781218 000 ZL 33881218 000 ZL 35181218 000 ZL 35281218 000 ZL 35681218 000 ZL 35781218 000 ZL 35881218 000 ZL 35981218 000 ZL 36081218 000 ZL 36181218 000 ZL 36281218 000 ZL 42381218 000 ZL 42981218 000 ZL 44481218 000 ZL 44581218 000 ZL 44681218 000 ZL 44781218 000 ZL 44881218 000 ZL 44981218 000 ZL 45081218 000 ZL 45181218 000 ZL 45281218 000 ZL 45381218 000 ZL 45481218 000 ZL 45581218 000 ZL 45681218 000 ZL 457
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 180 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
1,373 m²from the cadastral plan
Perimeter
180 mcomputed from the cadastral plan
Buildings
3 buildingsResidential
Built
1950 – 1974
Height to the eaves
up to 8.6 m
Storeys
up to 2 (ground floor included)
Dwellings
3
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UM5 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 248100737_PLUi_20251208

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Puygouzon

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Development guidelines (OAP)
OAP Paysage et aménagement (Intercommunale) – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Périmètre de droit de préemption urbain – 100% of the parcel
Development tax sector
Secteur de taxe d'aménagement – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
3 buildings
Use
Residential
Height to the eaves
up to 8.6 m
Storeys
up to 2 (ground floor included)
Dwellings
3
Built
1950 – 1974

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Plan de prévention des risques naturels concernant le risque retrait et gonflement des argiles – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
81218 000 ZL 11 (81218000ZL0011)
Commune
Puygouzon (81218)
Prefix
000
Section
ZL
Number
11
Recorded area (contenance)
1,380 m²
Computed area
1,373 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (248100737_PLUi_20251208)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 81218 000 ZL 10Next parcel: 81218 000 ZL 15