CarteparcelleMapFrançais

20 Avenue René Coty, 76600 Le Havre

5 buildings with 14 recorded homes, built before 1901 – after 1999, on a parcel of 2,478 m² (recorded area). Planning document zoning: urban zone (UApm).

Recorded area
2,478 m²
Planning zone
UApmUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

76351 000 JI 11476351 000 JI 12676351 000 JI 14176351 000 JI 14476351 000 JI 14576351 000 JI 14676351 000 JI 14976351 000 JI 16476351 000 JI 19576351 000 JI 21176351 000 JI 21876351 000 JI 22376351 000 JI 22576351 000 JI 22676351 000 JI 23176351 000 JI 23276351 000 JI 23476351 000 JI 23576351 000 JI 23676351 000 JI 23776351 000 JI 24076351 000 JI 241
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 209 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,476 m²from the cadastral plan
Perimeter
209 mcomputed from the cadastral plan
Buildings
5 buildingsResidential
Built
before 1901 – after 1999
Height to the eaves
up to 22.3 m
Storeys
up to 5 (ground floor included)
Dwellings
14
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UApm – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200084952_PLUi_20260212

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Le Havre

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Development guidelines (OAP)
LH05 - Coeur métropolitain – 100% of the parcel
Development guidelines (OAP)
OAP Projets de qualité – 100% of the parcel
Development guidelines (OAP)
LH06 - Centre reconstruit – 100% of the parcel
Minimum dwelling size
Taille minimale des logements – 100% of the parcel
Height
Plan des hauteurs – 100% of the parcel
Parking
S1 : Coeur métropolitain – 100% of the parcel
Retail diversity to protect
Diversité commerciale – line on the parcel or its boundary

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Energy-saving priority area
Zones d'Accélération des Énergies Renouvelables - Biomasse – 100% of the parcel
Energy-saving priority area
Zones d'Accélération des Énergies Renouvelables - Solaire PV – 100% of the parcel
Local advertising rules
Commune RLP 2ème génération – 100% of the parcel
Airport noise exposure plan
Fuseau du classement sonore du réseau routier départemental et communal – 100% of the parcel
Other information
AC4 - Site patrimonial remarquable – 100% of the parcel
Other information
Périmètre UNESCO – 100% of the parcel
Other information
T4 - Servitude aéronautique de balisage – 100% of the parcel
Other information
T5 - Servitude aéronautique de dégagement – 100% of the parcel
Other information
PM1 - PPRL - Plan de prévention de Risque Littoral - Submersion marine - de la Plaine Alluviale – 97% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Remarkable heritage site
Site Patrimonial Remarquable de Le Havre – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
5 buildings
1 of them also stands on other parcels; dwellings are counted for the whole building
Use
Residential
Height to the eaves
up to 22.3 m
Storeys
up to 5 (ground floor included)
Dwellings
14
Built
before 1901 – after 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PPRL par submersion marine de la Plaine Alluviale Nord de l'Embouchure de l'Estuaire de la Seine – 97% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
76351 000 JI 241 (76351000JI0241)
Commune
Le Havre (76351)
Prefix
000
Section
JI
Number
241
Recorded area (contenance)
2,478 m²
Computed area
2,476 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200084952_PLUi_20260212)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 76351 000 JI 240