CarteparcelleMapFrançais

589 Avenue Général Cartier, 73000 Chambéry

Cadastral parcel of 849 m² (recorded area). Planning document zoning: urban zone (UEA).

Recorded area
849 m²
Planning zone
UEAUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

73065 000 AK 14873065 000 AK 15373065 000 AK 16073065 000 AK 16373065 000 AK 16573065 000 AK 16673065 000 AK 34073065 000 AK 35173065 000 AK 35273065 000 AK 56673065 000 AK 56773065 000 AK 59373065 000 AK 59573065 000 AK 59773065 000 AK 59873065 000 AK 59973065 000 AK 60173065 000 AK 61573065 000 AK 93573065 000 AK 98673065 000 AK 98773065 000 AK 98873065 000 AK 98973065 000 AK 102273065 000 AK 102373065 000 AK 102473065 000 AK 102573065 000 AK 102673065 000 AK 102773065 000 AK 102873065 000 AK 102973065 000 AK 103473065 000 AK 103573065 000 AK 106973065 000 AK 117473065 000 AK 117573065 000 AK 117673065 000 AK 117773065 000 AK 1178
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 134 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
837 m²from the cadastral plan
Perimeter
134 mcomputed from the cadastral plan
Addresses
1 linked address
Risk prevention plans
4 plans recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UEA – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200069110_PLUI_20260309

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Chambéry

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Development guidelines (OAP)
Secteur comportant des orientations d'aménagement et de programmation (OAP) – 100% of the parcel
Road to keep
Tracé de principe pour cheminement piéton – line on the parcel or its boundary

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Reinforced urban pre-emption right
Périmètre de droit de préemption urbain renforcé – 100% of the parcel
Energy-saving priority area
Périmètre de développement prioritaire économie d'énergie – 100% of the parcel
Planning decision deferral area
Périmètre de sursis à statuer – 100% of the parcel
Local advertising rules
Limite d'agglomération – 100% of the parcel
Local advertising rules
T3 : périmètres d'interdiction de publicité – 100% of the parcel
Local advertising rules
ZP3 : Tissus résidentiel – 100% of the parcel
Transport noise sector
Zone d'exposition au bruit des infrastructures routières et ferroviaires – 7% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – 100% of the parcel
Natural or mining risk plan (PM1) – 100% of the parcel
Natural or mining risk plan (PM1) – 100% of the parcel
Natural or mining risk plan (PM1) – 100% of the parcel
Seismic zone
Zone 4 (medium)
Radon potential
Category 2 (low, with geological factors that can ease the transfer of radon)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
73065 000 AK 566 (73065000AK0566)
Commune
Chambéry (73065)
Prefix
000
Section
AK
Number
566
Recorded area (contenance)
849 m²
Computed area
837 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200069110_PLUI_20260309)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 73065 000 AK 565 – 60 Chemin du Clos Carron, 73000 ChambéryNext parcel: 73065 000 AK 567