1036 Allée d'Eyheraberry, 64220 Saint-Jean-Pied-de-Port

Parcel of 115 m² (recorded area) with 2 buildings. Planning document zoning: natural and forest zone (N).

Recorded area
115 m²
Planning zone
NNatural and forest zone (N)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

64485 000 B 25964485 000 B 27064485 000 B 68664485 000 B 68864485 000 B 69264485 000 B 88664485 000 B 88764485 000 B 88864485 000 B 88964485 000 B 105864485 000 B 105964485 000 B 106064485 000 B 106164485 000 B 106264485 000 B 106364485 000 B 106464485 000 B 107964485 000 B 112864485 000 B 112964485 000 B 113064485 000 B 113464485 000 B 113564485 000 B 113664485 000 B 113764485 000 B 113864485 000 B 113964485 000 B 114064485 000 B 114164485 000 B 114264485 000 B 114364485 000 B 1192
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 127 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
124 m²from the cadastral plan
Perimeter
127 mcomputed from the cadastral plan
Buildings
2 buildings
Height to the eaves
up to 5.3 m
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

N – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel
Document: 200067106_PLUi_20260228_C

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Saint-Jean-Pied-de-Port

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Building placement rules
Implantation des constructions par rapport aux voies et aux emprises publiques : règle N°5 – 100% of the parcel
Building placement rules
Implantation des constructions par rapport aux limites séparatives : règle N°3 – 100% of the parcel
Building footprint
Emprise au sol maximale. Règles spécifiques des zones A et N (cf article 1.1.2) – 100% of the parcel
Height
La hauteur des constructions n'excèdera pas 7 mètres à l'égout ou à l'acrotère pour les habitations et 10 mètres à l'égout du t… – 100% of the parcel
Open space and planting
Le coefficient minimal de pleine terre est fixé à 30 % pour les habitations et non réglementé pour les bâtiments agricoles et f… – 100% of the parcel
Building under conditions (environment, risks, public interest)
Secteurs avec conditions spéciales de constructibilité au regard du PPR pour le risque inondation – 5% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Other information
Grille règlement graphique – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed or classified site
Ville SAINT JEAN PIED DE PORT – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Height to the eaves
up to 5.3 m

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Plan de prevention des risques naturels previsibles et des risques miniers – 4% of the parcel
Seismic zone
Zone 4 (medium)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
64485 000 B 1079 (644850000B1079)
Commune
Saint-Jean-Pied-de-Port (64485)
Prefix
000
Section
B
Number
1079
Recorded area (contenance)
115 m²
Computed area
124 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200067106_PLUi_20260228_C)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 64485 000 B 1078 – 67 Chemin d'Olhonce, 64220 Saint-Jean-Pied-de-PortNext parcel: 64485 000 B 1080