CarteparcelleMapFrançais

18 Passage du Gué, 55000 Bar-le-Duc

Parcel of 173 m² (recorded area) with an outbuilding, built 1975 – 1999. Planning document zoning: urban zone (UA).

Recorded area
173 m²
Planning zone
UAUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

55029 000 AD 16255029 000 AD 16355029 000 AD 16555029 000 AD 16655029 000 AD 16755029 000 AD 16855029 000 AD 16955029 000 AD 17155029 000 AD 17255029 000 AD 17355029 000 AD 17455029 000 AD 17555029 000 AD 17655029 000 AD 17755029 000 AD 17855029 000 AD 17955029 000 AD 18055029 000 AD 18155029 000 AD 42555029 000 AD 46455029 000 AD 46555029 000 AD 46655029 000 AD 48155029 000 AD 48255029 000 AD 483
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 58 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
168 m²from the cadastral plan
Perimeter
58 mcomputed from the cadastral plan
Buildings
1 buildingOutbuilding
Built
1975 – 1999
Height to the eaves
6.1 m
Storeys
1 (ground floor included)
Dwellings
none
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UA – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Bar-le-Duc

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
DPU – 100% of the parcel
Sanitation and waste
Zone couverte par un plan d'adduction eau potable – 100% of the parcel
Sanitation and waste
Zone couverte par un plan d'assainissement – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Ancien Théâtre des Bleus de Bar – 100% of the parcel
Listed monument and its surroundings
Château – 100% of the parcel
Listed monument and its surroundings
Collège Gilles-de-Trèves – 100% of the parcel
Listed monument and its surroundings
Hôtel Billant (ancien) – 100% of the parcel
Listed monument and its surroundings
Hôtel de Marne (ancien) – 100% of the parcel
Listed monument and its surroundings
Immeuble – 100% of the parcel
Listed monument and its surroundings
Maison – 100% of the parcel
Listed monument and its surroundings
Maison des deux Barbeaux – 100% of the parcel
Listed monument and its surroundings
Synagogue – 100% of the parcel
Listed monument and its surroundings
tour de l' Horloge – 100% of the parcel
Listed monument and its surroundings
église Notre-Dame – 100% of the parcel
Listed monument and its surroundings
église Saint-Antoine – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Outbuilding
Height to the eaves
6.1 m
Storeys
1 (ground floor included)
Dwellings
none
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
55029 000 AD 465 (55029000AD0465)
Commune
Bar-le-Duc (55029)
Prefix
000
Section
AD
Number
465
Recorded area (contenance)
173 m²
Computed area
168 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (55029_20200803)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 55029 000 AD 464 – 7 Rue Notre Dame, 55000 Bar-le-DucNext parcel: 55029 000 AD 466