CarteparcelleMapFrançais

29 Rue Louis Aragon, 54510 Tomblaine

Parcel of 164 m² (recorded area) with a residential building, built 1975 – 1999. Planning document zoning: urban zone (U).

Recorded area
164 m²
Planning zone
UUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

54526 000 AT 6654526 000 AT 6754526 000 AT 6854526 000 AT 34254526 000 AT 34354526 000 AT 34454526 000 AT 34554526 000 AT 34654526 000 AT 34754526 000 AT 35454526 000 AT 35554526 000 AT 35654526 000 AT 35754526 000 AT 35854526 000 AT 35954526 000 AT 36054526 000 AT 36154526 000 AT 36254526 000 AT 36354526 000 AT 36454526 000 AT 36554526 000 AT 36654526 000 AT 37354526 000 AT 37454526 000 AT 37754526 000 AT 37854526 000 AT 38054526 000 AT 38154526 000 AT 38654526 000 AT 574
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 61 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
162 m²from the cadastral plan
Perimeter
61 mcomputed from the cadastral plan
Buildings
1 buildingResidential
Built
1975 – 1999
Height to the eaves
7.2 m
Storeys
2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

U – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 245400676_PLUI_20260709

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Tomblaine

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Building placement rules
Implantations : secteur n°2 - recul + discontinuité – 100% of the parcel
Social housing quota sector
Mixité sociale : diffus + seuil de déclenchement haut (DSH) – 100% of the parcel
Development guidelines (OAP)
Orientation d'Aménagement et de Programmation (OAP) Thématique : Adaptation au changement climatique – 100% of the parcel
Development guidelines (OAP)
Orientation d'Aménagement et de Programmation (OAP) Thématique : Patrimoines – 100% of the parcel
Development guidelines (OAP)
Orientation d'Aménagement et de Programmation (OAP) Thématique : Habitat – 100% of the parcel
Development guidelines (OAP)
Orientation d'Aménagement et de Programmation (OAP) Thématique : Commerce – 100% of the parcel
Development guidelines (OAP)
Orientation d'Aménagement et de Programmation (OAP) Thématique : Mobilités – 100% of the parcel
Mix of uses
Mixité fonctionnelle : secteur de Diversité (D) – 100% of the parcel
Height
Hauteurs : 7 m hauteur de façade + gabarit n°1 + dispo. particulière Limitation stricte – 100% of the parcel
Height
Hauteurs - dispositions particulières : Limitation stricte – 100% of the parcel
External appearance
Qualité urbaine et architecturale : dispositions générales (DG) – 100% of the parcel
Biotope (green space) ratio
Nature en ville : secteur n°4 (CBS 0,4 dont CPT 0,3) – 100% of the parcel
Parking
Stationnement : Seconde couronne (2) – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Périmètre de droit de préemption urbain – 100% of the parcel
Mining concession or underground storage
Périmètre minier de concession pour l'exploitation ou le stockage : Sel – 100% of the parcel
Archaeological site
Zonage archéologique : Consultation DRAC si emprise au sol terrasse > 3000 m2 – 100% of the parcel
Lead exposure risk area
Zone à risque d'exposition au plomb – 100% of the parcel
Sanitation zoning
Annexes sanitaires : assainissement – 100% of the parcel
Sanitation zoning
Annexes sanitaires : eau potable – 100% of the parcel
Sanitation zoning
Annexes sanitaires : eaux pluviales – 100% of the parcel
Sanitation zoning
Annexes sanitaires : gestion des déchets – 100% of the parcel
Sanitation zoning
Annexes sanitaires : plans et règlements communaux - Tomblaine – 100% of the parcel
Works subject to declaration or permit (demolition, fences, façades)
Secteur dans lequel les édifications de clôtures sont soumis à déclaration préalable – 100% of the parcel
Works subject to declaration or permit (demolition, fences, façades)
Secteur dans lequel les travaux de ravalement sont soumis à déclaration préalable – 100% of the parcel
Other information
Aléa affaissement (sondage salin) – 100% of the parcel
Other information
Aléa retrait-gonflement des argiles - Aléa fort – 100% of the parcel
Other information
Aléa sismicité : très faible – 100% of the parcel
Other information
Défense extérieure contre l'incendie – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
7.2 m
Storeys
2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
54526 000 AT 358 (54526000AT0358)
Commune
Tomblaine (54526)
Prefix
000
Section
AT
Number
358
Recorded area (contenance)
164 m²
Computed area
162 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (245400676_PLUI_20260709)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 54526 000 AT 357 – 31 Rue Louis Aragon, 54510 TomblaineNext parcel: 54526 000 AT 359 – 27 Rue Louis Aragon, 54510 Tomblaine