CarteparcelleMapFrançais

Parcel 51346 000 AC 112

Cadastral parcel of 1,995 m² (recorded area), in Mareuil-le-Port. Planning document zones: Ai.

Recorded area
1,995 m²
Planning zone
Ai (100%) · Ai (100%)Straddles 2 planning document zones.
51346 000 AC 1051346 000 AC 1151346 000 AC 1251346 000 AC 1351346 000 AC 1451346 000 AC 1751346 000 AC 1851346 000 AC 3351346 000 AC 10851346 000 AC 10951346 000 AC 11051346 000 AC 11151346 000 AC 11251346 000 AC 11351346 000 AC 11451346 000 AC 11551346 000 AC 11651346 000 AC 11751346 000 AC 125
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 304 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,042 m²from the cadastral plan
Perimeter
304 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Ai – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel
Document: 51346_PLU_20260203

Ai – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel
Document: 51346_PLU_20260203

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Mareuil-le-Port

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Development tax sector
Taxe d'aménagement – 100% of the parcel
Other information
Rayon de 500 mètres monument historique – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Eglise Saint-Rémy – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PPRi Débordement de la rivière Marne pour les communes du secteur d´Épernay - CCPC – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
51346 000 AC 112 (51346000AC0112)
Commune
Mareuil-le-Port (51346)
Prefix
000
Section
AC
Number
112
Recorded area (contenance)
1,995 m²
Computed area
2,042 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (51346_PLU_20260203)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 51346 000 AC 111Next parcel: 51346 000 AC 113