CarteparcelleMapFrançais

78B Rue Matignon, Torigni-sur-Vire, 50160 Torigny-les-Villes

Parcel of 1,001 m² (recorded area) with 3 buildings (residential, outbuilding), built 1900 or earlier. Planning document zoning: urban zone (Ub2).

Recorded area
1,001 m²
Planning zone
Ub2Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

50601 000 AH 10050601 000 AH 11750601 000 AH 11950601 000 AH 12050601 000 AH 12150601 000 AH 12250601 000 AH 12450601 000 AH 12550601 000 AH 12650601 000 AH 12750601 000 AH 12850601 000 AH 12950601 000 AH 14950601 000 AH 19750601 000 AH 19850601 000 AH 23450601 000 AH 23550601 000 AH 23650601 000 AH 25050601 000 AH 25150601 000 AH 26150601 000 AH 26250601 000 AH 26650601 000 AH 30850601 000 AH 31050601 000 AH 31150601 000 AH 31250601 000 AH 31350601 000 AH 31450601 000 AH 31550601 000 AH 33250601 000 AH 33350601 000 AH 33450601 000 AH 33550601 000 AH 33650601 000 AH 33750601 000 AH 33850601 000 AH 33950601 000 AH 34050601 000 AH 34150601 000 AH 347
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 161 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
989 m²from the cadastral plan
Perimeter
161 mcomputed from the cadastral plan
Buildings
3 buildingsResidential, outbuilding
Built
1900 or earlier
Height to the eaves
up to 9.1 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Addresses
2 linked addresses
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Ub2 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200066389_PLUI_20260119

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Torigny-les-Villes

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Social housing quota sector
Servitude de mixité sociale (SMS) – 100% of the parcel
Protected building heritage
Elements d'intérêt culturel, historique ou architectural à protéger (linéaire) – line on the parcel or its boundary

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
PDA de Torigny-les-Villes – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
3 buildings
Use
Residential, outbuilding
Height to the eaves
up to 9.1 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
1900 or earlier

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (3% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
50601 000 AH 262 (50601000AH0262)
Commune
Torigny-les-Villes (50601)
Prefix
000
Section
AH
Number
262
Recorded area (contenance)
1,001 m²
Computed area
989 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200066389_PLUI_20260119)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 50601 000 AH 261 – 78A Rue Matignon, Torigni-sur-Vire, 50160 Torigny-les-VillesNext parcel: 50601 000 AH 263 – 17 Rue Victor Hugo, Torigni-sur-Vire, 50160 Torigny-les-Villes