CarteparcelleMapFrançais

4 bis Rue de l'Arsenal, Saumur, 49400 Saumur

Parcel of 138 m² (recorded area) with an outbuilding. Planning document zoning: urban zone (UB).

Recorded area
138 m²
Planning zone
UBUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

49328 000 AI 21949328 000 AI 22449328 000 AI 22549328 000 AI 22749328 000 AI 26049328 000 AI 26149328 000 AI 26249328 000 AI 26349328 000 AI 26449328 000 AI 32349328 000 AI 33849328 000 AI 33949328 000 AI 35349328 000 AI 35549328 000 AI 35649328 000 AI 41249328 000 AI 54049328 000 AI 571
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 53 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
133 m²from the cadastral plan
Perimeter
53 mcomputed from the cadastral plan
Buildings
1 buildingOutbuilding
Height to the eaves
3.8 m
Storeys
1 (ground floor included)
Dwellings
none
Addresses
2 linked addresses
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UB – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200071876_PLUI_20260709_A

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Saumur

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Zone concernée par le DPU délégué aux communes – 100% of the parcel
Draft risk prevention plan
Périmètre des PPRI – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Eglise de la Visitation – 100% of the parcel
Listed monument and its surroundings
Hotel du Commandement (ancien) – 100% of the parcel
Listed monument and its surroundings
Hôtel du Belvédère – 100% of the parcel
Listed monument and its surroundings
Maison dite de la Reine de Sicile – 100% of the parcel
Remarkable heritage site
Site patrimonial remarquable de Saumur (AVAP) – 100% of the parcel
Listed monument and its surroundings
Théâtre – 67% of the parcel
Listed monument and its surroundings
Hôtel de Ville – 14% of the parcel

Documents on the Géoportail de l'Urbanisme: document 1, document 2

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Outbuilding
Height to the eaves
3.8 m
Storeys
1 (ground floor included)
Dwellings
none

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Plan de Prévention des Risques Naturels Prévisibles Inondation dans Val d'Authion Loire Saumuroise – 100% of the parcel
Seismic zone
Zone 2 (low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
49328 000 AI 339 (49328000AI0339)
Commune
Saumur (49328)
Prefix
000
Section
AI
Number
339
Recorded area (contenance)
138 m²
Computed area
133 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200071876_PLUI_20260709_A)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 49328 000 AI 338Next parcel: 49328 000 AI 342