CarteparcelleMapFrançais

14 Rue de la Pierre Hamon, 44410 La Chapelle-des-Marais

Parcel of 1,539 m² (recorded area) with a residential building, built 1975 – 1999. Planning document zoning: urban zone (UBa3).

Recorded area
1,539 m²
Planning zone
UBa3Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

44030 000 AC 12844030 000 AC 13544030 000 AC 13644030 000 AC 13744030 000 AC 13844030 000 AC 13944030 000 AC 14044030 000 AC 14144030 000 AC 14244030 000 AC 14344030 000 AC 14544030 000 AC 14644030 000 AC 15244030 000 AC 15344030 000 AC 15444030 000 AC 15744030 000 AC 17044030 000 AC 27444030 000 AC 29644030 000 AC 29744030 000 AC 37944030 000 AC 38144030 000 AC 38244030 000 AC 38344030 000 AC 38444030 000 AC 38544030 000 AC 38644030 000 AC 38844030 000 AC 38944030 000 AC 39044030 000 AC 43844030 000 AC 43944030 000 AC 465
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 157 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
1,541 m²from the cadastral plan
Perimeter
157 mcomputed from the cadastral plan
Buildings
1 buildingResidential
Built
1975 – 1999
Height to the eaves
5.2 m
Storeys
2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UBa3 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 244400644_PLUI_20251216

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in La Chapelle-des-Marais

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Parking requirements of the mobility plan
Zonage stationnement : secteur 3 – 100% of the parcel
Woodland preserved for ecology
Haie, alignement d'arbres, espace boisé répertorié – 5% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Périmètre de droit de préemption urbain – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
5.2 m
Storeys
2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
44030 000 AC 143 (44030000AC0143)
Commune
La Chapelle-des-Marais (44030)
Prefix
000
Section
AC
Number
143
Recorded area (contenance)
1,539 m²
Computed area
1,541 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (244400644_PLUI_20251216)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 44030 000 AC 142 – 16 Rue de la Pierre Hamon, 44410 La Chapelle-des-MaraisNext parcel: 44030 000 AC 145 – 21 Rue de la Pierre Hamon, 44410 La Chapelle-des-Marais