CarteparcelleMapFrançais

12 ter Rue de Bas-Foux, 41350 Vineuil

Parcel of 2,282 m² (recorded area) with 2 buildings (residential), built 2000 or later. Planning document zoning: urban zone (Uv3).

Recorded area
2,282 m²
Planning zone
Uv3Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

41295 000 ED 141295 000 ED 241295 000 ED 341295 000 ED 441295 000 ED 541295 000 ED 641295 000 ED 741295 000 ED 841295 000 ED 941295 000 ED 1041295 000 ED 1241295 000 ED 1341295 000 ED 1441295 000 ED 1541295 000 ED 1641295 000 ED 1741295 000 ED 1841295 000 ED 1941295 000 ED 2041295 000 ED 2141295 000 ED 2241295 000 ED 2341295 000 ED 2441295 000 ED 2541295 000 ED 2641295 000 ED 2741295 000 ED 2841295 000 ED 2941295 000 ED 3041295 000 ED 3141295 000 ED 24641295 000 ED 24741295 000 ED 24841295 000 ED 279
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 210 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,278 m²from the cadastral plan
Perimeter
210 mcomputed from the cadastral plan
Buildings
2 buildingsResidential
Built
2000 or later
Height to the eaves
up to 4.5 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Uv3 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200030385_PLUI_20260630

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Vineuil

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Social housing quota sector
Secteur de diversité sociale – 100% of the parcel
Parking
Plan de stationnement – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Zonage assainissement - VINEUIL – 100% of the parcel
World Heritage property
Périmètre d'un bien inscrit au patrimoine mondial - UNESCO – 100% of the parcel
Other information
Exposition au retrait et au gonflement des argiles – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential
Height to the eaves
up to 4.5 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
2000 or later

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
41295 000 ED 3 (41295000ED0003)
Commune
Vineuil (41295)
Prefix
000
Section
ED
Number
3
Recorded area (contenance)
2,282 m²
Computed area
2,278 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200030385_PLUI_20260630)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 41295 000 ED 2 – 12 quater Rue de Bas-Foux, 41350 VineuilNext parcel: 41295 000 ED 4