CarteparcelleMapFrançais

Parcel 38022 506 ZB 42

Cadastral parcel of 1.3 ha (recorded area), in Les Avenières Veyrins-Thuellin. Planning document zoning: natural and forest zone (N).

Recorded area
1.3 ha
Planning zone
NNatural and forest zone (N)
38022 506 ZB 138022 506 ZB 238022 506 ZB 338022 506 ZB 438022 506 ZB 538022 506 ZB 638022 506 ZB 738022 506 ZB 838022 506 ZB 938022 506 ZB 1038022 506 ZB 1138022 506 ZB 1238022 506 ZB 1338022 506 ZB 1438022 506 ZB 1538022 506 ZB 1638022 506 ZB 1738022 506 ZB 1838022 506 ZB 1938022 506 ZB 2038022 506 ZB 2138022 506 ZB 2238022 506 ZB 2338022 506 ZB 2438022 506 ZB 2538022 506 ZB 2638022 506 ZB 2738022 506 ZB 2838022 506 ZB 2938022 506 ZB 3038022 506 ZB 3138022 506 ZB 3238022 506 ZB 3338022 506 ZB 3438022 506 ZB 3538022 506 ZB 3638022 506 ZB 3738022 506 ZB 3838022 506 ZB 3938022 506 ZB 4038022 506 ZB 4138022 506 ZB 4238022 506 ZB 4338022 506 ZB 4438022 506 ZB 4538022 506 ZB 4638022 506 ZB 4738022 506 ZB 4838022 506 ZB 4938022 506 ZB 5038022 506 ZB 5138022 506 ZB 5238022 506 ZB 5338022 506 ZB 5438022 506 ZB 6638022 506 ZB 7038022 506 ZB 7138022 506 ZB 11638022 506 ZB 13138022 506 ZB 14538022 506 ZB 147
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 461 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
1.3 hafrom the cadastral plan
Perimeter
461 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

N – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel
Document: 38541_PLU_20220711

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Les Avenières Veyrins-Thuellin

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Building restricted (environment, risks, public interest)
Zonage reglementaire de PPRI Zone detude – 100% of the parcel
Building restricted (environment, risks, public interest)
Zonage reglementaire de PPRI Zone sans contrainte spécifique – 100% of the parcel
Protected built or landscape heritage
Elements paysagers et environnementaux a proteger Trame bleue – 100% of the parcel
Building restricted (environment, risks, public interest)
Remontee de nappe Alea faible – 61% of the parcel
Building restricted (environment, risks, public interest)
Zone constructible sous conditions INONDATIONS EN PIED DE VERSANT et REMONTEES DE NAPPE (alea faible d inondation en pied de ve… – 61% of the parcel
Building restricted (environment, risks, public interest)
Inondation du RHONE Alea Fort – 38% of the parcel
Building restricted (environment, risks, public interest)
Zone inconstructible sauf exceptions INONDATIONS EN PIED DE VERSANT et REMONTEES DE NAPPE (alea fort ou moyen d inondation en p… – 38% of the parcel
Building restricted (environment, risks, public interest)
INONDATIONS Crue rapide des rivieres Alea Fort – 2% of the parcel
Building restricted (environment, risks, public interest)
Zone inconstructible sauf exceptions CRUES RAPIDES DES RIVIERE (aleas fort ou moyen (tous secteurs), ou faible (zones naturelle… – 2% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Assainissement au cas par cas – 100% of the parcel
Sanitation zoning
ZONAGE D'ASSAINISSEMENT : Zone d'assainissement non collectif – 100% of the parcel
Sanitation zoning
ZONAGE DES EAUX PLUVIALES : Zone naturelle et agricole/implantation des terrains à limiter au maximum – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Watercourse maintenance access
100% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PERI - Veyrins-Thuellin – 100% of the parcel
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
38022 506 ZB 42 (38022506ZB0042)
Commune
Les Avenières Veyrins-Thuellin (38022)
Prefix
506 – Former commune (merged or delegated)
Section
506 ZB
Number
42
Recorded area (contenance)
1.3 ha
Computed area
1.3 ha Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (38022_PLU_20190429)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 38022 506 ZB 41Next parcel: 38022 506 ZB 43