Cadastral parcel of 3.8 ha (recorded area), in Saint-Plantaire. Planning document zoning: agricultural zone (A).

Recorded area
3.8 ha
Planning zone
AAgricultural zone (A)
36207 000 ZR 736207 000 ZR 836207 000 ZR 1536207 000 ZR 1736207 000 ZR 1936207 000 ZR 2036207 000 ZR 2136207 000 ZR 2236207 000 ZR 2336207 000 ZR 2436207 000 ZR 2536207 000 ZR 2636207 000 ZR 2736207 000 ZR 2836207 000 ZR 2936207 000 ZR 3036207 000 ZR 3136207 000 ZR 3236207 000 ZR 3336207 000 ZR 3436207 000 ZR 3536207 000 ZR 7736207 000 ZR 8336207 000 ZR 8636207 000 ZR 8736207 000 ZR 8836207 000 ZR 8936207 000 ZR 9036207 000 ZR 11136207 000 ZR 11236207 000 ZR 11336207 000 ZR 11436207 000 ZR 11536207 000 ZR 117
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 1,004 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
3.8 hafrom the cadastral plan
Perimeter
1,004 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

A – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel
Document: 200007052_PLUi_20200302

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Saint-Plantaire

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
36207 000 ZR 27 (36207000ZR0027)
Commune
Saint-Plantaire (36207)
Prefix
000
Section
ZR
Number
27
Recorded area (contenance)
3.8 ha
Computed area
3.8 ha Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200007052_PLUi_20200302)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 36207 000 ZR 26Next parcel: 36207 000 ZR 28