CarteparcelleMapFrançais

1 Rue du Paradis, 36300 Pouligny-Saint-Pierre

Parcel of 2,199 m² (recorded area) with 4 buildings (residential), built 1900 or earlier. Planning document zones: Ah and A.

Recorded area
2,199 m²
Planning zone
Ah (73%) · A (27%)Straddles 2 planning document zones.

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

36165 000 L 218836165 000 L 219536165 000 L 219636165 000 L 219736165 000 L 219836165 000 L 220036165 000 L 220236165 000 L 220436165 000 L 220536165 000 L 220636165 000 L 220736165 000 L 221536165 000 L 221636165 000 L 221736165 000 L 221936165 000 L 222436165 000 L 222536165 000 L 222636165 000 L 222736165 000 L 222836165 000 L 222936165 000 L 223036165 000 L 223136165 000 L 223836165 000 L 223936165 000 L 224036165 000 L 225136165 000 L 225236165 000 L 225536165 000 L 319936165 000 L 322836165 000 L 322936165 000 L 330636165 000 L 331336165 000 L 331436165 000 L 331536165 000 L 331636165 000 L 331736165 000 L 331836165 000 L 331936165 000 L 332036165 000 L 332136165 000 L 333536165 000 L 333636165 000 L 334436165 000 L 3345
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 222 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,204 m²from the cadastral plan
Perimeter
222 mcomputed from the cadastral plan
Buildings
4 buildingsResidential
Built
1900 or earlier
Height to the eaves
up to 5.5 m
Storeys
up to 1 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Ah – Agricultural zone (A)

Protected farmland: building is strictly limited.

73% of the parcel
Document: 243600319_PLUi_20231130

A – Agricultural zone (A)

Protected farmland: building is strictly limited.

27% of the parcel
Document: 243600319_PLUi_20231130

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Pouligny-Saint-Pierre

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Protected building heritage
Eléments de petit patrimoine protégés au titre de l'article L.151-19 du Code de l'Urbanisme – point feature on the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
4 buildings
Use
Residential
Height to the eaves
up to 5.5 m
Storeys
up to 1 (ground floor included)
Dwellings
1
Built
1900 or earlier

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – 100% of the parcel
Seismic zone
Zone 2 (low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
36165 000 L 2217 (361650000L2217)
Commune
Pouligny-Saint-Pierre (36165)
Prefix
000
Section
L
Number
2217
Recorded area (contenance)
2,199 m²
Computed area
2,204 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (243600319_PLUi_20231130)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 36165 000 L 2216Next parcel: 36165 000 L 2219