CarteparcelleMapFrançais

Parcel 35122 000 AD 89

Parcel of 744 m² (recorded area) with 2 buildings, in La Gouesnière. Planning document zoning: development zone (1AUh).

Recorded area
744 m²
Planning zone
1AUhDevelopment zone (AUc)
35122 000 AD 8635122 000 AD 8735122 000 AD 8835122 000 AD 8935122 000 AD 9135122 000 AD 9235122 000 AD 10235122 000 AD 10335122 000 AD 10435122 000 AD 12835122 000 AD 14535122 000 AD 14635122 000 AD 14735122 000 AD 14835122 000 AD 14935122 000 AD 15135122 000 AD 15235122 000 AD 15635122 000 AD 24435122 000 AD 24535122 000 AD 24635122 000 AD 24735122 000 AD 24835122 000 AD 24935122 000 AD 25035122 000 AD 25135122 000 AD 26235122 000 AD 26335122 000 AD 26535122 000 AD 26735122 000 AD 268
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 112 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
744 m²from the cadastral plan
Perimeter
112 mcomputed from the cadastral plan
Buildings
2 buildings
Height to the eaves
up to 8.3 m
Addresses
None linked
Clay soils
Not recorded
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

1AUh – Development zone (AUc)

Area set aside for development: building is allowed as services arrive or as part of a wider scheme, under the PLU rules.

100% of the parcel
Document: 35122_PLU_20230215

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in La Gouesnière

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Development guidelines (OAP)
Orientation d'aménagement programmée secteur 3 – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
droit de préemption urbain – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Height to the eaves
up to 8.3 m

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Not recorded
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

The parcel in its section

Details

Cadastral reference
35122 000 AD 89 (35122000AD0089)
Commune
La Gouesnière (35122)
Prefix
000
Section
AD
Number
89
Recorded area (contenance)
744 m²
Computed area
744 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (35122_PLU_20230215)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 35122 000 AD 88Next parcel: 35122 000 AD 90