CarteparcelleMapFrançais

299 Chemin Font du Noyer, 34980 Montferrier-sur-Lez

Parcel of 2,068 m² (recorded area) with 2 buildings (residential, outbuilding), built 1975 – 1999. Planning document zoning: urban zone (UC 4-3-a).

Recorded area
2,068 m²
Planning zone
UC 4-3-aUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

34169 000 AM 7934169 000 AM 8134169 000 AM 8534169 000 AM 8634169 000 AM 8734169 000 AM 8834169 000 AM 8934169 000 AM 9034169 000 AM 9134169 000 AM 9234169 000 AM 9334169 000 AM 9434169 000 AM 9934169 000 AM 11934169 000 AM 16134169 000 AM 16234169 000 AM 18734169 000 AM 188
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 179 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,078 m²from the cadastral plan
Perimeter
179 mcomputed from the cadastral plan
Buildings
2 buildingsResidential, outbuilding
Built
1975 – 1999
Height to the eaves
up to 7 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
2 plans recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UC 4-3-a – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 243400017_PLUi_20260602

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Montferrier-sur-Lez

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Social housing quota sector
SMS – 100% of the parcel
Building footprint
Emprise bâtie – 100% of the parcel
Height
Hauteur maximale – 100% of the parcel
External appearance
Aspect extérieur – 100% of the parcel
Biotope (green space) ratio
Espace perméable – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
DPUS MONTFERRIER SUR LEZ – 100% of the parcel
Sanitation zoning
AC MONTFERRIER-SUR-LEZ – 100% of the parcel
Other information
Glissement de terrain – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential, outbuilding
Height to the eaves
up to 7 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Bassin de risque 1 MONTFERRIER SUR LEZ – 100% of the parcel
Natural or mining risk plan (PM1) – MONTFERRIER SUR LEZ – 100% of the parcel
Seismic zone
Zone 2 (low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
34169 000 AM 91 (34169000AM0091)
Commune
Montferrier-sur-Lez (34169)
Prefix
000
Section
AM
Number
91
Recorded area (contenance)
2,068 m²
Computed area
2,078 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (243400017_PLUI_20260602)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 34169 000 AM 90 – 23 Chemin des Aigueilleres, 34980 Montferrier-sur-LezNext parcel: 34169 000 AM 92 – 241 Chemin Font du Noyer, 34980 Montferrier-sur-Lez