CarteparcelleMapFrançais

134 Impasse du Hameau, 33210 Saint-Pierre-de-Mons

Parcel of 322 m² (recorded area) with 1 building. Planning document zoning: urban zone (U2A).

Recorded area
322 m²
Planning zone
U2AUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

33465 000 B 36833465 000 B 38633465 000 B 39033465 000 B 39133465 000 B 39433465 000 B 39533465 000 B 42133465 000 B 66633465 000 B 71333465 000 B 102533465 000 B 107433465 000 B 107733465 000 B 107833465 000 B 107933465 000 B 108033465 000 B 108133465 000 B 110133465 000 B 113333465 000 B 113533465 000 B 113633465 000 B 113733465 000 B 113933465 000 B 114133465 000 B 120833465 000 B 132433465 000 B 132533465 000 B 132633465 000 B 132833465 000 B 135133465 000 B 135233465 000 B 135333465 000 B 135433465 000 B 138933465 000 B 139033465 000 B 1391
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 86 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
335 m²from the cadastral plan
Perimeter
86 mcomputed from the cadastral plan
Buildings
1 building
Height to the eaves
2.6 m
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

U2A – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200043974_PLUI_20251112

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Saint-Pierre-de-Mons

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Building placement rules
Implantation aux voies et emprises publiques - 2 - Implantation libre – 100% of the parcel
Building placement rules
Implantation aux limites séparatives - 2 - Implantation libre. Si retrait, retrait > H/2 avec minimum de 3 mètres – 100% of the parcel
Building footprint
Emprise au sol- 40% – 100% of the parcel
Height
Règlementation des hauteurs - 7 mètres E + A / 9 mètres au faitage > R+1 ou R+1+C – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Height to the eaves
2.6 m

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
33465 000 B 390 (334650000B0390)
Commune
Saint-Pierre-de-Mons (33465)
Prefix
000
Section
B
Number
390
Recorded area (contenance)
322 m²
Computed area
335 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200043974_PLUI_20251112)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 33465 000 B 386 – 1186 Route de Pédebayle, 33210 Saint-Pierre-de-MonsNext parcel: 33465 000 B 391