CarteparcelleMapFrançais

Parcel 26155 000 AM 103

Cadastral parcel of 380 m² (recorded area), in Lapeyrouse-Mornay. Planning document zoning: urban zone (Ua).

Recorded area
380 m²
Planning zone
UaUrban zone (U)
26155 000 AM 1826155 000 AM 2126155 000 AM 9826155 000 AM 9926155 000 AM 10126155 000 AM 10326155 000 AM 11326155 000 AM 11426155 000 AM 11526155 000 AM 11626155 000 AM 11726155 000 AM 11826155 000 AM 11926155 000 AM 14026155 000 AM 18426155 000 AM 19726155 000 AM 31426155 000 AM 33626155 000 AM 33726155 000 AM 34326155 000 AM 344
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 99 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
378 m²from the cadastral plan
Perimeter
99 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Ua – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 26155_PLU_20250211

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Lapeyrouse-Mornay

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Périmètre de Droit de Préemption Urbain (DPU) – 100% of the parcel
Transport noise sector
Périmètre de voisinage d'infrastructure de transport terrestre – 90% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
26155 000 AM 103 (26155000AM0103)
Commune
Lapeyrouse-Mornay (26155)
Prefix
000
Section
AM
Number
103
Recorded area (contenance)
380 m²
Computed area
378 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (26155_PLU_20250211)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Previous parcel: 26155 000 AM 101 – 47 Route de Moras, 26210 Lapeyrouse-MornayNext parcel: 26155 000 AM 111