CarteparcelleMapFrançais

21 Rue Jean Epivent, Pordic, 22590 Pordic

Parcel of 3,539 m² (recorded area) with 3 buildings (commercial and services). Planning document zoning: urban zone (U).

Recorded area
3,539 m²
Planning zone
UUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

22251 000 ZR 3122251 000 ZR 3322251 000 ZR 4722251 000 ZR 15722251 000 ZR 17322251 000 ZR 26122251 000 ZR 26422251 000 ZR 26522251 000 ZR 29122251 000 ZR 30422251 000 ZR 30522251 000 ZR 32522251 000 ZR 38422251 000 ZR 39022251 000 ZR 41422251 000 ZR 41522251 000 ZR 47522251 000 ZR 58522251 000 ZR 58922251 000 ZR 60222251 000 ZR 60322251 000 ZR 66622251 000 ZR 66722251 000 ZR 66822251 000 ZR 66922251 000 ZR 68822251 000 ZR 69522251 000 ZR 696
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 265 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
3,485 m²from the cadastral plan
Perimeter
265 mcomputed from the cadastral plan
Buildings
3 buildingsCommercial and services
Height to the eaves
up to 5 m
Storeys
up to 1 (ground floor included)
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

U – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200069409_PLUI_20250626

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Pordic

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Building placement rules
Non réglementé – 100% of the parcel
Building placement rules
Non réglementée, toutefois, l'implantation en limite(s) séparative(s) est autorisée sous réserve d'avoir un mur coupe-feu – 100% of the parcel
Development guidelines (OAP)
OAP Trame verte et bleue – 100% of the parcel
Mix of uses
Pôle productif support – 100% of the parcel
Building footprint
Emprise au sol non réglementée avec coefficient de biotope à 20% – 100% of the parcel
Height
Non réglementé – 100% of the parcel
External appearance
Secteur à vocation d'activité économique – 100% of the parcel
Building restricted (environment, risks, public interest)
Bande de protection inconstructible aux abords des zones humides : 10 m (L.151-23 du Code de l'Urbanisme) – 6% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Reinforced urban pre-emption right
Droit de préemption urbain renforcé – 100% of the parcel
Local advertising rules
Règlement local de publicité intercommunal – 100% of the parcel
Airport noise exposure plan
Plan d'exposition au bruit des aérodromes – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Power lines
29% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
3 buildings
Use
Commercial and services
Height to the eaves
up to 5 m
Storeys
up to 1 (ground floor included)

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (4% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
22251 000 ZR 695 (22251000ZR0695)
Commune
Pordic (22251)
Prefix
000
Section
ZR
Number
695
Recorded area (contenance)
3,539 m² Contenance arpentée (measured on site).
Computed area
3,485 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200069409_PLUI_20250626)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 22251 000 ZR 690Next parcel: 22251 000 ZR 696