CarteparcelleMapFrançais

34 Rue de Kerarzic, 22260 Plouëc-du-Trieux

Parcel of 878 m² (recorded area) with 2 buildings (residential), built 1975 – 1999. Planning document zoning: urban zone (Uhc).

Recorded area
878 m²
Planning zone
UhcUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

22212 000 E 32022212 000 E 33722212 000 E 35122212 000 E 35822212 000 E 36222212 000 E 107222212 000 E 108522212 000 E 126722212 000 E 126822212 000 E 126922212 000 E 127022212 000 E 128622212 000 E 128722212 000 E 128822212 000 E 132322212 000 E 132522212 000 E 133722212 000 E 133822212 000 E 135222212 000 E 135322212 000 E 141822212 000 E 142022212 000 E 153022212 000 E 153122212 000 E 153422212 000 E 153522212 000 E 153722212 000 E 154122212 000 E 156722212 000 E 156822212 000 E 156922212 000 E 157122212 000 E 157222212 000 E 157322212 000 E 157422212 000 E 157622212 000 E 157722212 000 E 157822212 000 E 159322212 000 E 159422212 000 E 159522212 000 E 1596
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 118 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
853 m²from the cadastral plan
Perimeter
118 mcomputed from the cadastral plan
Buildings
2 buildingsResidential
Built
1975 – 1999
Height to the eaves
up to 4.1 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Uhc – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200067981_PLUI_20260303

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Plouëc-du-Trieux

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Social housing quota sector
Secteur à programme de logements mixité sociale en zone U et AU – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Périmètre de droit de préemption urbain – 100% of the parcel
Sanitation zoning
Zones d assainissement collectif – 100% of the parcel
Development tax sector
Secteur de taxe d'aménagement – 100% of the parcel
Other information
Retrait-gonflement argile – 100% of the parcel
Other information
Secteurs dans lequel l'édification d'une clôture doit être précédée d'une déclaration préalable – 100% of the parcel
Other information
Secteurs dans lequel les travaux de ravalement sont soumis à déclaration préalable – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Gare ferroviaire de Brélidy-Plouëc – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential
Height to the eaves
up to 4.1 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
22212 000 E 1269 (222120000E1269)
Commune
Plouëc-du-Trieux (22212)
Prefix
000
Section
E
Number
1269
Recorded area (contenance)
878 m²
Computed area
853 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200067981_PLUI_20260303)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 22212 000 E 1268Next parcel: 22212 000 E 1270