CarteparcelleMapFrançais

1 Place Buffon, 21500 Montbard

5 buildings with 2 recorded homes, built 1900 or earlier, on a parcel of 2,638 m² (recorded area). Planning document zoning: urban zone (UA).

Recorded area
2,638 m²
Planning zone
UAUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

21425 000 AM 3621425 000 AM 3721425 000 AM 3821425 000 AM 3921425 000 AM 4021425 000 AM 4221425 000 AM 4321425 000 AM 4421425 000 AM 4521425 000 AM 4621425 000 AM 4721425 000 AM 4821425 000 AM 4921425 000 AM 5021425 000 AM 5121425 000 AM 5221425 000 AM 5321425 000 AM 5421425 000 AM 5521425 000 AM 5621425 000 AM 5721425 000 AM 5821425 000 AM 5921425 000 AM 6221425 000 AM 6321425 000 AM 6421425 000 AM 6521425 000 AM 6621425 000 AM 6721425 000 AM 6821425 000 AM 6921425 000 AM 7021425 000 AM 7121425 000 AM 7221425 000 AM 7421425 000 AM 7521425 000 AM 7621425 000 AM 7721425 000 AM 7821425 000 AM 9021425 000 AM 9321425 000 AM 9421425 000 AM 9521425 000 AM 9621425 000 AM 9721425 000 AM 9821425 000 AM 9921425 000 AM 10021425 000 AM 10121425 000 AM 10221425 000 AM 10321425 000 AM 10521425 000 AM 10621425 000 AM 10821425 000 AM 10921425 000 AM 11021425 000 AM 11121425 000 AM 11221425 000 AM 11321425 000 AM 11421425 000 AM 11521425 000 AM 11621425 000 AM 11721425 000 AM 11821425 000 AM 12021425 000 AM 26721425 000 AM 26821425 000 AM 27321425 000 AM 27521425 000 AM 27621425 000 AM 28221425 000 AM 28321425 000 AM 28421425 000 AM 30021425 000 AM 30121425 000 AM 30221425 000 AM 30321425 000 AM 31621425 000 AM 31721425 000 AM 36221425 000 AM 36521425 000 AM 39121425 000 AM 39221425 000 AM 399
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 239 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
2,633 m²from the cadastral plan
Perimeter
239 mcomputed from the cadastral plan
Buildings
5 buildingsResidential
Built
1900 or earlier
Height to the eaves
up to 11.6 m
Storeys
up to 3 (ground floor included)
Dwellings
2
Addresses
3 linked addresses
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UA – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 21425_PLU_20251217

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Montbard

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Limite droit de préemption urbain – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Anciens jardins potagers de Buffon – 100% of the parcel
Listed monument and its surroundings
Anciens jardins potagers de Buffon et ancienne propriété Daubenton – 100% of the parcel
Listed monument and its surroundings
Château de Buffon – 100% of the parcel
Listed monument and its surroundings
Eglise saint Urse – 100% of the parcel
Listed monument and its surroundings
Hôtel de Buffon (Musée Buffon) – 100% of the parcel
Listed monument and its surroundings
Maison de l'Arquebuse – 100% of the parcel
Listed or classified site
Abords du Parc et maison de Buffon a Montbard – 96% of the parcel

Documents on the Géoportail de l'Urbanisme: document 1, document 2

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
5 buildings
2 of them also stand on other parcels; dwellings are counted for the whole building
Use
Residential
Height to the eaves
up to 11.6 m
Storeys
up to 3 (ground floor included)
Dwellings
2
Built
1900 or earlier

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
21425 000 AM 62 (21425000AM0062)
Commune
Montbard (21425)
Prefix
000
Section
AM
Number
62
Recorded area (contenance)
2,638 m²
Computed area
2,633 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (21425_PLU_20251217)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 21425 000 AM 59 – 15 Rue du Parc Buffon, 21500 MontbardNext parcel: 21425 000 AM 63 – 21 Rue Eugène Guillaume, 21500 Montbard