CarteparcelleMapFrançais

22 Avenue de la soude, 13009 Marseille 9e Arrondissement

Parcel of 3,430 m² (recorded area) with 2 buildings (residential, outbuilding), built 1975 – 1999. Planning document zoning: urban zone (UP3).

Recorded area
3,430 m²
Planning zone
UP3Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

13209 852 B 113209 852 B 413209 852 B 513209 852 B 613209 852 B 713209 852 B 2913209 852 B 3813209 852 B 3913209 852 B 4013209 852 B 4113209 852 B 4213209 852 B 4313209 852 B 4413209 852 B 4513209 852 B 5913209 852 B 7413209 852 B 7513209 852 B 7613209 852 B 7713209 852 B 7813209 852 B 8113209 852 B 8413209 852 B 8513209 852 B 8613209 852 B 8913209 852 B 9013209 852 B 9113209 852 B 9213209 852 B 9313209 852 B 10013209 852 B 10213209 852 B 10313209 852 B 11013209 852 B 11113209 852 B 11213209 852 B 11313209 852 B 11413209 852 B 12213209 852 B 12413209 852 B 15213209 852 B 15313209 852 B 15413209 852 B 15513209 852 B 15613209 852 B 15713209 852 B 15813209 852 B 15913209 852 B 16013209 852 B 16113209 852 B 16213209 852 B 16313209 852 B 16413209 852 B 16513209 852 B 17613209 852 B 19113209 852 B 19313209 852 B 19413209 852 B 19513209 852 B 19613209 852 B 19713209 852 B 19913209 852 B 20013209 852 B 20213209 852 B 20413209 852 B 205
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 309 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
3,402 m²from the cadastral plan
Perimeter
309 mcomputed from the cadastral plan
Buildings
2 buildingsResidential, outbuilding
Built
1975 – 1999
Height to the eaves
up to 5.2 m
Storeys
up to 1 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UP3 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200054807_PLUI_20260803_A

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Marseille 9e Arrondissement

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Limits on sealed surfaces
Zonage pluvial 1 – 100% of the parcel
Protected garden or open land in a built-up area
Terrain cultivé à protéger – 61% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Droit de Préemption Urbain (DPU) – 100% of the parcel
Local advertising rules
Règlement Local de Publicité Intercommunal (RLPi) – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential, outbuilding
Height to the eaves
up to 5.2 m
Storeys
up to 1 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PPR retrait-gonflement d'argile de Marseille – 100% of the parcel
Seismic zone
Not recorded
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
13209 852 B 81 (132098520B0081)
Commune
Marseille 9e Arrondissement (13209)
Prefix
852 – Former commune (merged or delegated)
Section
852 B
Number
81
Recorded area (contenance)
3,430 m²
Computed area
3,402 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200054807_PLUI_20260803_A)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 13209 852 B 78Next parcel: 13209 852 B 84