Parcel 13099 000 AB 13
Cadastral parcel of 6,968 m² (recorded area), in Saint-Paul-lès-Durance. Planning document zones: N and AUoap.
- Recorded area
- 6,968 m²
- Planning zone
- N (94%) · AUoap (6%)Straddles 2 planning document zones.
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)
At a glance
- Computed area
- 6,971 m²from the cadastral plan
- Perimeter
- 337 mcomputed from the cadastral plan
- Addresses
- None linked
- Risk prevention plans
- 1 plan recorded
This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.
What this means for a project
- Zone N: new buildings are in principle excluded; a measured extension of an existing home may be allowed where the rules provide for it. Guide: Turn the map finding into a specific question
- Zone AUoap: building follows the arrival of services or a planned development; the PLU’s development guidelines describe what is planned. Guide: Start with the zone and its document
- The parcel is split between 2 zones: each part follows the rules of its own zone. Guide: Read the documents, not just the colour
- 9 prescriptions, information areas or easements touch the parcel (details below): they apply on top of the zone’s rules. Guide: Read the documents, not just the colour
- Clay soils: High exposure (41% of the parcel), medium (59%). General rule in medium or high exposure areas: the seller of unbuilt buildable land supplies a preliminary geotechnical study where planning rules permit individual houses. Exposure alone does not establish that this sale is covered. Construction projects are subject to separate rules to check with the professional. Géorisques: soil studies and construction
- PER séisme et mouvement de terrain de Saint-Paul-lès-Durance covers 100% of the parcel: its rules may forbid or restrict building; read them before any project. Guide: Identify the scope of each finding
- Seismic zone 4 (medium): a new house must follow the earthquake-resistant building rules. Guide: Identify the scope of each finding
Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.
Understanding the map information
- French planning: who decides what
- The public data behind the map
- Reading and finding a cadastral reference
- Cadastre and boundary surveys: where does the land end?
- Reading a PLU: a zone label does not define a project
- Recorded and calculated parcel area: why two figures?
- Addresses and parcels: why they do not always match
- Parcel owners: what the map does not show and where to ask
- Dividing a plot: preparing a land division
- Property risks: from a map finding to a proper check
Planning zoning
N – Natural and forest zone (N)
Protected natural areas, forests and landscapes: building is strictly limited.
94% of the parcel
Document: 200054807_PLUI_20260306_B
AUoap – Development zone (AUc)
Area set aside for development: building is allowed as services arrive or as part of a wider scheme, under the PLU rules.
6% of the parcel
Document: 200054807_PLUI_20260306_B
Addresses
No address from the Base Adresse Nationale is linked to this parcel.
All addresses in Saint-Paul-lès-Durance
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction
- Building restricted (environment, risks, public interest)
- Risque feux en RZ et UF – 74% of the parcel
- Building restricted (environment, risks, public interest)
- Risque inondation ViM – 60% of the parcel
- Ecological corridor (green and blue network)
- Réservoirs écologiques : de biodiversité boisés – 30% of the parcel
- Ecological corridor (green and blue network)
- Réservoirs écologiques : majeurs – 8% of the parcel
- Development guidelines (OAP)
- Orientation Aménagement Programmé (OAP) sectorielle – 6% of the parcel
- Building footprint
- Coefficient d'emprise au sol : entre 30 et 40 % – 6% of the parcel
- Height
- Hauteur entre 8 et 10 m – 6% of the parcel
- Building placement rules
- Marge de recul – line on the parcel or its boundary
See the document on the Géoportail de l'Urbanisme
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
- Urban pre-emption right
- Droit de Préemption Urbain – 6% of the parcel
See the document on the Géoportail de l'Urbanisme
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Not recorded in the Géoportail de l'Urbanisme
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.
- Clay shrink-swell
- High exposure (41% of the parcel), medium (59%)
- Risk prevention plan
- Natural or mining risk plan (PM1) – PER séisme et mouvement de terrain de Saint-Paul-lès-Durance – 100% of the parcel
- Seismic zone
- Zone 4 (medium)
- Radon potential
- Category 1 (low)
National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
The parcel in its section
- By recorded area, larger than 83% of the 30 parcels of section AB whose area is recorded.
- Median recorded area in the section: 2,614 m².
- 6 of the section’s 30 parcels have a linked building, 7 an address.
- Saint-Paul-lès-Durance has 2,128 parcels; this one holds 0.02% of their total recorded area.
Details
- Cadastral reference
- 13099 000 AB 13 (13099000AB0013)
- Commune
- Saint-Paul-lès-Durance (13099)
- Prefix
- 000
- Section
- AB
- Number
- 13
- Recorded area (contenance)
- 6,968 m²
- Computed area
- 6,971 m² Computed from the plan, may differ from the recorded area.
Planning in this commune
- Planning document
- Intermunicipal zoning plan (PLUi) (200054807_PLUI_20260306_B)
Find the applicable document on the official GPU map
Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Planning zones (share of parcel area):
- Natural and forest zone (N) (66%)
- Urban zone (U) (30%)
- Agricultural zone (A) (3%)
- Development zone (AUc) (0%)
Source datasets used on this page: 6. Their dates and reuse terms can differ.
Sources and versions used on this page
- Plan cadastral informatisé (Etalab)
2026-06-01— Licence Ouverte / Open Licence 2.0Cadastre Etalab redistributes the French digital cadastral plan in simplified geographic formats, including parcels, sections and buildings. Mapped boundaries do not replace a boundary survey.
- Géoportail de l’Urbanisme — extraction nationale
2026-08-15— Licence Ouverte / Open Licence 2.0The national Urban Planning Geoportal extraction brings together layers published by the GPU from documents supplied by municipalities, intermunicipal authorities and state services. The competent authorities remain responsible for the documents and their regulatory meaning.
- Base Adresse Nationale (listes d’adresses et géocodage Géoplateforme)
2026-10-07— Licence Ouverte / Open Licence 2.0The Base Adresse Nationale brings together French addresses, including those published by municipalities. Address coordinates alone do not establish an administrative link to a cadastral parcel.
- Exposition au retrait-gonflement des argiles
2026-07-02— Licence Ouverte / Open Licence 2.0The clay shrink-swell exposure map describes geological exposure at the map’s scale. It does not replace a site-specific geotechnical investigation.
- Zonage sismique de la France (décret n° 2010-1255), liste version janvier 2015
2018-07-30— Licence Ouverte / Open Licence 1.0This vector layer published by wpd is based on the BRGM / planseisme.fr list of municipalities and seismic zones, January 2015 version. Municipal zoning does not measure the structural risk of an individual building.
- Potentiel radon des communes (arrêté du 27 juin 2018)
2019-05-06— Licence Ouverte / Open Licence 1.0Radon potential zoning classifies municipalities according to their geological potential to emit radon. It does not measure the indoor radon concentration of an individual building.
Neighbouring parcels
Previous parcel: 13099 000 AB 12Next parcel: 13099 000 AB 14