CarteparcelleMapFrançais

1516 Chemin du Pas de la Mue, 13170 Les Pennes-Mirabeau

Parcel of 519 m² (recorded area) with a residential building, built 2000 or later. Planning document zoning: urban zone (UDa1).

Recorded area
519 m²
Planning zone
UDa1Urban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

13071 000 CX 1013071 000 CX 23113071 000 CX 25113071 000 CX 25213071 000 CX 25313071 000 CX 25413071 000 CX 25513071 000 CX 25613071 000 CX 33413071 000 CX 44113071 000 CX 44213071 000 CX 48713071 000 CX 51713071 000 CX 57613071 000 CX 58013071 000 CX 58113071 000 CX 58213071 000 CX 58313071 000 CX 58413071 000 CX 58513071 000 CX 58613071 000 CX 59313071 000 CX 59513071 000 CX 60113071 000 CX 60213071 000 CX 60313071 000 CX 60413071 000 CX 60513071 000 CX 60613071 000 CX 60713071 000 CX 60813071 000 CX 60913071 000 CX 61013071 000 CX 61113071 000 CX 61213071 000 CX 61413071 000 CX 62713071 000 CX 628
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 96 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
518 m²from the cadastral plan
Perimeter
96 mcomputed from the cadastral plan
Buildings
1 buildingResidential
Built
2000 or later
Height to the eaves
8.3 m
Storeys
1 (ground floor included)
Dwellings
1
Addresses
1 linked address
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

UDa1 – Urban zone (U)

Urban zone family. This category does not establish permission to build: check the local code, applicable rules and parcel constraints.

100% of the parcel
Document: 200054807_PLUI_20260306_B

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Les Pennes-Mirabeau

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Social housing quota sector
Secteur de mixite sociale sans taille minimum : type 3 – 100% of the parcel
Building footprint
Coefficient d'emprise au sol : entre 30 et 40 % – 100% of the parcel
Height
Hauteur entre 6 et 8 m – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Droit de Préemption Urbain – 100% of the parcel
Reinforced urban pre-emption right
Droit de Préemption Urbain Renforcé – 100% of the parcel
Draft risk prevention plan
Plan de prévention des risques d'incendie de forêt (PPRIF) – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
8.3 m
Storeys
1 (ground floor included)
Dwellings
1
Built
2000 or later

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PPR retrait-gonflement d'argile des Pennes-Mirabeau – 100% of the parcel
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
13071 000 CX 608 (13071000CX0608)
Commune
Les Pennes-Mirabeau (13071)
Prefix
000
Section
CX
Number
608
Recorded area (contenance)
519 m² Contenance arpentée (measured on site).
Computed area
518 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200054807_PLUI_20260306_B)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 13071 000 CX 607 – 1516 Chemin du Pas de la Mue, 13170 Les Pennes-MirabeauNext parcel: 13071 000 CX 609 – 1516 Chemin du Pas de la Mue, 13170 Les Pennes-Mirabeau