CarteparcelleMapFrançais

Parcel 08333 000 ZP 6

Cadastral parcel of 7,850 m² (recorded area), in Olizy-Primat. Local plan (PLU) zoning: natural and forest zone (N).

Recorded area
7,850 m²
PLU zone
NNatural and forest zone (N)
08333 000 ZP 308333 000 ZP 408333 000 ZP 508333 000 ZP 608333 000 ZP 708333 000 ZP 808333 000 ZP 908333 000 ZP 1008333 000 ZP 1108333 000 ZP 1208333 000 ZP 1308333 000 ZP 1408333 000 ZP 1508333 000 ZP 1608333 000 ZP 1708333 000 ZP 1808333 000 ZP 1908333 000 ZP 2008333 000 ZP 2108333 000 ZP 2508333 000 ZP 2808333 000 ZP 2908333 000 ZP 3008333 000 ZP 3108333 000 ZP 3208333 000 ZP 3308333 000 ZP 3408333 000 ZP 3508333 000 ZP 3608333 000 ZP 3708333 000 ZP 3808333 000 ZP 3908333 000 ZP 4008333 000 ZP 7208333 000 ZP 7308333 000 ZP 7508333 000 ZP 11308333 000 ZP 11708333 000 ZP 118
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 505 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
7,783 m²from the cadastral plan
Perimeter
505 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
1 plan recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

PLU zoning

N – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel
Document: 240800920_PLUi_20260226

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Olizy-Primat

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Other information
Plan de Prévention du Risque inondation – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – Plan de Prevention des Risques naturels Previsibles d'Inondations – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

The parcel in its section

Details

Cadastral reference
08333 000 ZP 6 (08333000ZP0006)
Commune
Olizy-Primat (08333)
Prefix
000
Section
ZP
Number
6
Recorded area (contenance)
7,850 m²
Computed area
7,783 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (240800920_PLUi_20260226)

PLU zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 08333 000 ZP 5Next parcel: 08333 000 ZP 7