CarteparcelleMapFrançais

Parcel 04193 000 H 460

Cadastral parcel of 6 ha (recorded area), in Saint-Paul-sur-Ubaye. Planning document zoning: natural and forest zone (Nn).

Recorded area
6 ha
Planning zone
NnNatural and forest zone (N)
04193 000 H 43104193 000 H 43204193 000 H 43904193 000 H 44004193 000 H 44104193 000 H 44204193 000 H 44304193 000 H 44404193 000 H 44504193 000 H 44604193 000 H 44704193 000 H 44804193 000 H 44904193 000 H 45004193 000 H 45104193 000 H 45204193 000 H 45304193 000 H 45404193 000 H 45504193 000 H 45604193 000 H 45704193 000 H 45804193 000 H 45904193 000 H 46004193 000 H 46104193 000 H 46204193 000 H 46304193 000 H 46404193 000 H 492
The parcel (in colour) and its neighbours, from the cadastre; computed perimeter: 1,539 m. North is up; the bar gives the scale.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

At a glance

Computed area
5.9 hafrom the cadastral plan
Perimeter
1,539 mcomputed from the cadastral plan
Addresses
None linked
Risk prevention plans
Not recorded

This parcel’s figures, from the cadastre, the national address base (BAN), IGN’s BD TOPO and the risk databases. Missing data is not shown.

What this means for a project

Points drawn from this parcel’s data. They tell you which questions to ask; they do not replace a certificat d’urbanisme or the official statement of risks.

Understanding the map information

Planning zoning

Nn – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Saint-Paul-sur-Ubaye

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (43% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 4 (medium)
Radon potential
Category 3 (significant)

National clay exposure (BRGM/Géorisques) and labels in the local planning document are separate sources: dates, methods and purposes may differ. Both values are retained; neither replaces the other. Check the national map and local rules with the authorities. Data versions: national clay layer 2026-07-02; GPU extraction 2026-08-15. Géorisques: soil studies and construction

The parcel in its section

Details

Cadastral reference
04193 000 H 460 (041930000H0460)
Commune
Saint-Paul-sur-Ubaye (04193)
Prefix
000
Section
H
Number
460
Recorded area (contenance)
6 ha
Computed area
5.9 ha Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (0419320190915)

Find the applicable document on the official GPU map

Document identified in the data, without assurance that it covers the whole commune or every parcel. Several documents may apply. Check coverage and the current version with the town hall or GPU. For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Planning zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 04193 000 H 459Next parcel: 04193 000 H 461