- Parcels
- 2,785
- Cadastral sections
- 10
- Recorded area (contenance)
- 664.2 ha
- Commune code (INSEE)
- 90039
Sections
- Section A498 parcels
- Section B423 parcels
- Section AB126 parcels
- Section AC423 parcels
- Section AD237 parcels
- Section AE429 parcels
- Section AH389 parcels
- Section AI31 parcels
- Section AK63 parcels
- Section AL166 parcels
Planning
- Planning document
- Local zoning plan (PLU) (90039_PLU_20230411)
PLU zones (share of parcel area):
- Natural and forest zone (N) (65%)
- Urban zone (U) (18%)
- Agricultural zone (A) (16%)
- Development zone (AUc) (1%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Building restricted (environment, risks, public interest)
- 629 parcels
- Ecological corridor (green and blue network)
- 260 parcels
- Protected built or landscape heritage
- 35 parcels
- Development guidelines (OAP)
- 17 parcels
- Comprehensive development required
- 17 parcels
- Social housing quota sector
- 13 parcels
- Buildings in a farm or natural zone
- 9 parcels
- Reserved site
- 5 parcels
- Height
- 3 parcels
- Classified woodland (EBC)
- 1 parcel
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Development tax sector.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Urban pre-emption right
- 1,932 parcels
- Transport noise sector
- 340 parcels
- Public forest regime
- 158 parcels
- Soil information sector (pollution)
- 15 parcels
- Joint development zone (ZAC)
- 12 parcels
- Other information
- 6 parcels
- Sanitation and waste
- 2 parcels
- Archaeological site
- 1 parcel
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Power lines
- 227 parcels
- Listed monument and its surroundings
- 15 parcels
Addresses
1,159 addresses on 65 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 2 (low, with geological factors that can ease the transfer of radon)
- Clay shrink-swell
- 29% of the parcels' area with high exposure, 46% medium
- Risk prevention plan
- Not recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)