CarteparcelleMapFrançais

Neuville-sur-Saône cadastre

Rhône (69)

Parcels
2,869
Cadastral sections
7
Recorded area (contenance)
482 ha
Commune code (INSEE)
69143

Sections

Planning

Planning document
Intermunicipal zoning plan (PLUi) (200046977_PLUI_20260326)

PLU zones (share of parcel area):

This PLU is intermunicipal: prepared by the intermunicipal authority, it must be compatible with the territorial coherence scheme (SCoT) covering the area or, failing that, with the higher-level documents. Guide: who decides what in planning

Zoning plan statistics: prescriptions, information areas and easements

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Cover more than 90% of the parcels: Building restricted (environment, risks, public interest) and Parking.

Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:

Social housing quota sector
1,916 parcels
Uses allowed under conditions
722 parcels
Ecological corridor (green and blue network)
596 parcels
Height
543 parcels
Classified woodland (EBC)
504 parcels
Development guidelines (OAP)
246 parcels
Protected built or landscape heritage
212 parcels
Retail diversity to protect or develop
189 parcels
Reserved site
162 parcels
Building placement rules
37 parcels
Road, path or public transport to keep or create
36 parcels
Open space and planting
34 parcels
Biotope (green space) ratio
21 parcels
Buildings in a farm or natural zone
9 parcels

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Cover more than 90% of the parcels: Sanitation and waste.

Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:

Transport noise sector
741 parcels
Peri-urban farmland protection
212 parcels
Soil information sector (pollution)
29 parcels
Urban pre-emption right
1 parcel

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:

Remarkable heritage site
1,238 parcels
Railways
376 parcels
Listed monument and its surroundings
11 parcels
Classified installation or polluted site
9 parcels

Addresses

1,142 addresses on 95 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.

See the 1,142 addresses

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Seismic zone
Zone 2 (low)
Radon potential
Category 2 (low, with geological factors that can ease the transfer of radon)
Clay shrink-swell
88% of the parcels' area with medium exposure, 13% low
Risk prevention plan
  • Natural or mining risk plan (PM1): 828 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
  • Technological risk plan (PM3): 124 parcels within a perimeter recorded in the Géoportail de l'Urbanisme

Property prices

Loading prices…

The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)