- Parcels
- 1,480
- Cadastral sections
- 9
- Recorded area (contenance)
- 930.9 ha
- Commune code (INSEE)
- 25612
Sections
- Section D67 parcels
- Section AB329 parcels
- Section AC209 parcels
- Section ZA135 parcels
- Section ZB126 parcels
- Section ZC66 parcels
- Section ZD273 parcels
- Section ZE160 parcels
- Section ZH115 parcels
Planning
- Planning document
- Local zoning plan (PLU) (25612_PLU_20260309)
PLU zones (share of parcel area):
- Natural and forest zone (N) (58%)
- Agricultural zone (A) (37%)
- Urban zone (U) (5%)
- Development zone (AUc) (0%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Building restricted (environment, risks, public interest)
- 228 parcels
- Ecological corridor (green and blue network)
- 166 parcels
- Development guidelines (OAP)
- 72 parcels
- Reserved site
- 50 parcels
- Building placement rules
- 32 parcels
- Remarkable coastal area
- 22 parcels
- Classified woodland (EBC)
- 4 parcels
- Road, path or public transport to keep or create
- 4 parcels
- Protected built or landscape heritage
- 2 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Archaeological site and Local advertising rules.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Forest planting rules
- 1,205 parcels
- Mining concession or underground storage
- 847 parcels
- Sanitation and waste
- 695 parcels
- Urban pre-emption right
- 666 parcels
- Transport noise sector
- 130 parcels
- Other information
- 13 parcels
- Joint development zone (ZAC)
- 1 parcel
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 12 parcels
Addresses
372 addresses on 24 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 2 (low, with geological factors that can ease the transfer of radon)
- Clay shrink-swell
- 15% of the parcels' area with high exposure, 78% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 113 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)