CarteparcelleMapFrançais

14 Allée de la Pièce Rouge, 69230 Saint-Genis-Laval

Parcel of 623 m² (recorded area) with a residential building, built 1975 – 1999. Local plan (PLU) zoning: urban zone (URi2b).

Recorded area
623 m²
PLU zone
URi2bUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

69204 000 AH 469204 000 AH 1169204 000 AH 1269204 000 AH 1369204 000 AH 1469204 000 AH 1569204 000 AH 1969204 000 AH 9369204 000 AH 10569204 000 AH 14869204 000 AH 14969204 000 AH 15069204 000 AH 15169204 000 AH 15269204 000 AH 15469204 000 AH 15569204 000 AH 15969204 000 AH 16069204 000 AH 16169204 000 AH 16269204 000 AH 16369204 000 AH 16469204 000 AH 16569204 000 AH 19369204 000 AH 19569204 000 AH 19669204 000 AH 197
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

URi2b – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 200046977_PLUI_20260326

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Saint-Genis-Laval

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Building restricted (environment, risks, public interest)
Risque d inondation par ruissellement-ZONE PRODUCTION – 100% of the parcel
Social housing quota sector
Secteur de mixite sociale – 100% of the parcel
Parking
Secteur de stationnement-E – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Zone d assainissement-COLLECTI – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
5.5 m
Storeys
2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – PPRNi Yzeron – 100% of the parcel
Seismic zone
Zone 2 (low)
Radon potential
Category 3 (significant)

Details

Cadastral reference
69204 000 AH 160 (69204000AH0160)
Commune
Saint-Genis-Laval (69204)
Prefix
000
Section
AH
Number
160
Recorded area (contenance)
623 m²
Computed area
619 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200046977_PLUI_20260326)

PLU zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 69204 000 AH 159Next parcel: 69204 000 AH 161