CarteparcelleMapFrançais

38 Rue de la République, Pierre-Bénite, 69310 Oullins-Pierre-Bénite

Building with 2 homes, built 1900 or earlier, on a parcel of 267 m² (recorded area). Local plan (PLU) zoning: urban zone (UCe3a).

Recorded area
267 m²
PLU zone
UCe3aUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

69149 152 AL 8969149 152 AL 9069149 152 AL 9169149 152 AL 9269149 152 AL 9369149 152 AL 9469149 152 AL 9569149 152 AL 9669149 152 AL 9769149 152 AL 9869149 152 AL 12269149 152 AL 12469149 152 AL 12669149 152 AL 13269149 152 AL 13469149 152 AL 31869149 152 AL 35869149 152 AL 39969149 152 AL 45469149 152 AL 455
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UCe3a – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 200046977_PLUI_20260326

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Oullins-Pierre-Bénite

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Building restricted (environment, risks, public interest)
Risque d inondation par ruissellement-ZONE PRODUCTION – 100% of the parcel
Building restricted (environment, risks, public interest)
Risque technologique-ZP – 100% of the parcel
Protected landscape heritage
Perimetre d interet patrimonial-A1 – 100% of the parcel
Social housing quota sector
Secteur de mixite sociale – 100% of the parcel
Development guidelines (OAP)
OAP-2 – 100% of the parcel
Minimum dwelling size
Secteur de taille minimale des logements-1 – 100% of the parcel
Height
Hauteur Max-7 – 100% of the parcel
Parking
Secteur de stationnement-Da – 100% of the parcel
Uses allowed under conditions
Polarite commerciale – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Zone d assainissement-COLLECTI – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Residential
Height to the eaves
8.4 m
Storeys
2 (ground floor included)
Dwellings
2
Built
1900 or earlier

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Technological risk plan (PM3) – PM3 PPRT VALLEE CHIMIE SUP – 100% of the parcel
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

Details

Cadastral reference
69149 152 AL 95 (69149152AL0095)
Commune
Oullins-Pierre-Bénite (69149)
Prefix
152 – Former commune (merged or delegated)
Section
152 AL
Number
95
Recorded area (contenance)
267 m²
Computed area
271 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200046977_PLUI_20260326)

PLU zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 69149 152 AL 94 – 36 Rue de la République, Pierre-Bénite, 69310 Oullins-Pierre-BéniteNext parcel: 69149 152 AL 96 – 42 Rue de la République, Pierre-Bénite, 69310 Oullins-Pierre-Bénite