CarteparcelleMapFrançais

6 Rue d’Aspe, 64260 Arudy

Parcel of 957 m² (recorded area) with 2 buildings (residential, outbuilding), built 1975 – 1999. Local plan (PLU) zoning: urban zone (UB).

Recorded area
957 m²
PLU zone
UBUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

64062 000 BI 264062 000 BI 6064062 000 BI 6464062 000 BI 6564062 000 BI 6664062 000 BI 6764062 000 BI 6864062 000 BI 6964062 000 BI 7064062 000 BI 7264062 000 BI 7764062 000 BI 7864062 000 BI 7964062 000 BI 8064062 000 BI 8164062 000 BI 8364062 000 BI 9864062 000 BI 9964062 000 BI 12364062 000 BI 12464062 000 BI 12664062 000 BI 14864062 000 BI 14964062 000 BI 15064062 000 BI 15164062 000 BI 15464062 000 BI 21564062 000 BI 21664062 000 BI 25564062 000 BI 25664062 000 BI 25764062 000 BI 25864062 000 BI 25964062 000 BI 26064062 000 BI 26164062 000 BI 26264062 000 BI 26364062 000 BI 26464062 000 BI 26564062 000 BI 27364062 000 BI 274
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UB – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 64062_PLU_20250922

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Arudy

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Urban pre-emption right
Droit de préemption Urbain – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
Use
Residential, outbuilding
Height to the eaves
up to 6.5 m
Storeys
up to 2 (ground floor included)
Dwellings
1
Built
1975 – 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 4 (medium)
Radon potential
Category 2 (low, with geological factors that can ease the transfer of radon)

Details

Cadastral reference
64062 000 BI 149 (64062000BI0149)
Commune
Arudy (64062)
Prefix
000
Section
BI
Number
149
Recorded area (contenance)
957 m²
Computed area
939 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (64062_PLU_20250922)

PLU zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 64062 000 BI 148Next parcel: 64062 000 BI 150 – 5 bis Rue d’Aspe, 64260 Arudy