CarteparcelleMapFrançais

Parcel 38156 000 B 226

Cadastral parcel of 5,400 m² (recorded area), in Les Éparres. Local plan (PLU) zoning: natural and forest zone (N).

Recorded area
5,400 m²
PLU zone
NNatural and forest zone (N)
38156 000 B 2038156 000 B 2138156 000 B 2338156 000 B 2438156 000 B 2538156 000 B 3138156 000 B 5138156 000 B 20638156 000 B 20738156 000 B 20838156 000 B 20938156 000 B 21038156 000 B 21138156 000 B 21238156 000 B 22238156 000 B 22338156 000 B 22438156 000 B 22538156 000 B 22638156 000 B 227
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

N – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel
Document: 38156_PLU_20190701

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Les Éparres

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

No building (environment, risks, public interest)
secteur inconstructible sauf exception – 100% of the parcel
Building under conditions (environment, risks, public interest)
secteur constructible sous conditions speciales (retrait-gonflement des argiles) – 100% of the parcel
Building under conditions (environment, risks, public interest)
secteur en assainissement non collectif – 100% of the parcel
Landscape feature preserved for ecology
Zone d interet ecologique (ZNIEFF de type I) – 100% of the parcel
Development guidelines (OAP)
OAP thematique "Mise en valeur de l'activite agricole, de l'environnement et du paysage" – 100% of the parcel
Classified woodland (EBC)
Espace Boise Classe – 88% of the parcel
Landscape feature preserved for ecology
Zone Humide – 15% of the parcel
No building (environment, risks, public interest)
Secteurs interdits à la construction en raison de l'exposition à des risques naturels (voir chapitre 1 du réglement écrit) – 5% of the parcel
Ecological corridor (green and blue network)
Protections environnementales - Réservoir de biodiversité remarquable – 3% of the parcel
Ecological corridor (green and blue network)
Protections environnementales - Zone humide – 3% of the parcel

Documents on the Géoportail de l'Urbanisme: document 1, document 2

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Zonage d'assainissement (eaux usees et eaux puviales) – 100% of the parcel
Other information
Alimentation en eau potable – 100% of the parcel
Other information
Dechets – 100% of the parcel
Other information
Defense incendie – 100% of the parcel
Other information
Reseau d'electricite – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Watercourse maintenance access
93% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

Details

Cadastral reference
38156 000 B 226 (381560000B0226)
Commune
Les Éparres (38156)
Prefix
000
Section
B
Number
226
Recorded area (contenance)
5,400 m²
Computed area
5,563 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (38156_PLU_20190701)

PLU zones (share of parcel area):

Source datasets used on this page: 6. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 38156 000 B 225Next parcel: 38156 000 B 227