CarteparcelleMapFrançais

2163 Route DE GONDRIN, 32250 Montréal

Parcel of 1.4 ha (recorded area) with a commercial building, built 2000 or later. Local plan (PLU) zoning: urban zone (UL).

Recorded area
1.4 ha
PLU zone
ULUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

32290 000 E 42532290 000 E 43132290 000 E 50232290 000 E 50332290 000 E 51032290 000 E 51132290 000 E 64332290 000 E 64632290 000 E 86932290 000 E 88232290 000 E 88532290 000 E 98132290 000 E 98332290 000 E 98432290 000 E 98632290 000 E 99932290 000 E 100032290 000 E 100132290 000 E 100232290 000 E 100332290 000 E 100432290 000 E 109032290 000 E 110332290 000 E 110432290 000 E 110532290 000 E 118032290 000 E 118132290 000 E 118232290 000 E 118632290 000 E 118732290 000 E 118832290 000 E 1189
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UL – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 243200417_PLUI_20251217

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Montréal

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Ecological corridor (green and blue network)
Eléments de continuité écologique et la Trame Verte et Bleue – 18% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Use
Commercial and services
Height to the eaves
2.8 m
Storeys
1 (ground floor included)
Dwellings
none
Built
2000 or later

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Natural or mining risk plan (PM1) – 100% of the parcel
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

Details

Cadastral reference
32290 000 E 1104 (322900000E1104)
Commune
Montréal (32290)
Prefix
000
Section
E
Number
1104
Recorded area (contenance)
1.4 ha
Computed area
1.5 ha Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (243200417_PLUi_20251217)

PLU zones (share of parcel area):

Source datasets used on this page: 8. Their dates and reuse terms can differ.

Sources and versions used on this page

Neighbouring parcels

Previous parcel: 32290 000 E 1103Next parcel: 32290 000 E 1105