- Parcels
- 5,124
- Cadastral sections
- 6
- Recorded area (contenance)
- 2,054.9 ha
- Commune code (INSEE)
- 69175
Sections
- Section A479 parcels
- Section B924 parcels
- Section C847 parcels
- Section D1,454 parcels
- Section E633 parcels
- Section F787 parcels
Planning
- Planning document
- Local zoning plan (PLU) (69175_20211214)
PLU zones (share of parcel area):
- Agricultural zone (A) (58%)
- Natural and forest zone (N) (37%)
- Urban zone (U) (4%)
- Development zone (AUc) (0%)
- Closed development zone (AUs) (0%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Building restricted (environment, risks, public interest).
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Protected built or landscape heritage
- 1,498 parcels
- Classified woodland (EBC)
- 762 parcels
- Ecological corridor (green and blue network)
- 153 parcels
- Development guidelines (OAP)
- 57 parcels
- Social housing quota sector
- 56 parcels
- Reserved site
- 43 parcels
- Buildings in a farm or natural zone
- 22 parcels
- Other prescription
- 5 parcels
- Road, path or public transport to keep or create
- 2 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Forest planting rules, Lead exposure risk area, Sanitation and waste and Mining concession or underground storage.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Other information
- 1,089 parcels
- Transport noise sector
- 270 parcels
- Demolition permit required
- 6 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Remarkable heritage site
- 1,401 parcels
- Railways
- 148 parcels
- Listed monument and its surroundings
- 105 parcels
- Power lines
- 51 parcels
- Listed or classified site
- 27 parcels
- Flood water retention area
- 8 parcels
Addresses
999 addresses on 163 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 2 (low)
- Radon potential
- Category 3 (significant)
- Clay shrink-swell
- 3% of the parcels' area with high exposure, 22% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 5,124 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)