- Parcels
- 1,957
- Cadastral sections
- 12
- Recorded area (contenance)
- 874.8 ha
- Commune code (INSEE)
- 63224
Sections
- Section AA360 parcels
- Section AB1 parcel
- Section AC1 parcel
- Section ZA230 parcels
- Section ZB62 parcels
- Section ZC31 parcels
- Section ZD22 parcels
- Section ZE62 parcels
- Section ZH85 parcels
- Section ZI183 parcels
- Section ZK347 parcels
- Section ZL573 parcels
Planning
- Planning document
- Intermunicipal zoning plan (PLUi) (200070753_PLUi_20260602)
PLU zones (share of parcel area):
- Agricultural zone (A) (54%)
- Natural and forest zone (N) (35%)
- Urban zone (U) (10%)
- Development zone (AUc) (1%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Protected built or landscape heritage
- 283 parcels
- Height
- 239 parcels
- Building placement rules
- 177 parcels
- Development guidelines (OAP)
- 103 parcels
- Retail diversity to protect or develop
- 66 parcels
- Reserved site
- 51 parcels
- Buildings in a farm or natural zone
- 5 parcels
- Classified woodland (EBC)
- 3 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Soil information sector (pollution) and Forest planting rules.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Transport noise sector
- 1,275 parcels
- Sanitation and waste
- 1,124 parcels
- Urban pre-emption right
- 1,113 parcels
- Sensitive natural area pre-emption zone
- 246 parcels
- Other information
- 195 parcels
- Local advertising rules
- 20 parcels
- Works subject to declaration or permit (demolition, fences, façades)
- 20 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Power lines
- 258 parcels
- Railways
- 138 parcels
Addresses
848 addresses on 64 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 1 (low)
- Clay shrink-swell
- 97% of the parcels' area with high exposure, 3% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 1,260 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)