- Parcels
- 1,559
- Cadastral sections
- 17
- Recorded area (contenance)
- 1,363.4 ha
- Commune code (INSEE)
- 63196
Sections
- Section C63 parcels
- Section D327 parcels
- Section ZA132 parcels
- Section ZB129 parcels
- Section ZC40 parcels
- Section ZD141 parcels
- Section ZE69 parcels
- Section ZH15 parcels
- Section ZI166 parcels
- Section ZK27 parcels
- Section ZL91 parcels
- Section ZM128 parcels
- Section ZN25 parcels
- Section ZO94 parcels
- Section ZP51 parcels
- Section ZR20 parcels
- Section ZS41 parcels
Planning
- Planning document
- Intermunicipal zoning plan (PLUi) (200071199_PLUi_20260120)
PLU zones (share of parcel area):
- Natural and forest zone (N) (67%)
- Agricultural zone (A) (29%)
- Urban zone (U) (4%)
- Development zone (AUc) (0%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Protected built or landscape heritage
- 380 parcels
- Road, path or public transport to keep or create
- 33 parcels
- Building restricted (environment, risks, public interest)
- 23 parcels
- Development guidelines (OAP)
- 10 parcels
- Ecological corridor (green and blue network)
- 7 parcels
- Buildings in a farm or natural zone
- 4 parcels
- Retail diversity to protect or develop
- 4 parcels
- Reserved site
- 2 parcels
- Classified woodland (EBC)
- 1 parcel
- Other prescription
- 1 parcel
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Sanitation and waste and Other information.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Urban pre-emption right
- 653 parcels
- Areas and habitats to preserve (wetlands…)
- 1 parcel
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 55 parcels
Addresses
375 addresses on 30 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 1 (low)
- Clay shrink-swell
- 15% of the parcels' area with high exposure, 76% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 465 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)