- Parcels
- 2,978
- Cadastral sections
- 24
- Recorded area (contenance)
- 928.3 ha
- Commune code (INSEE)
- 45269
Sections
- Section F3 parcels
- Section G21 parcels
- Section AA82 parcels
- Section AB237 parcels
- Section AC224 parcels
- Section AD200 parcels
- Section AE141 parcels
- Section AH218 parcels
- Section AI266 parcels
- Section AK57 parcels
- Section AL480 parcels
- Section AM147 parcels
- Section AN81 parcels
- Section AO49 parcels
- Section AP52 parcels
- Section AR210 parcels
- Section AS63 parcels
- Section AT30 parcels
- Section ZA60 parcels
- Section ZD93 parcels
- Section ZE88 parcels
- Section ZK43 parcels
- Section ZL45 parcels
- Section ZM88 parcels
Planning
- Planning document
- Local zoning plan (PLU) (45269_PLU_20260115)
PLU zones (share of parcel area):
- Agricultural zone (A) (68%)
- Urban zone (U) (20%)
- Natural and forest zone (N) (10%)
- Development zone (AUc) (2%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Building placement rules
- 250 parcels
- Protected built or landscape heritage
- 104 parcels
- Classified woodland (EBC)
- 89 parcels
- Development guidelines (OAP)
- 39 parcels
- Reserved site
- 38 parcels
- Building restricted (environment, risks, public interest)
- 2 parcels
- Other prescription
- 2 parcels
- Buildings in a farm or natural zone
- 1 parcel
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Deferred development zone (ZAD)
- 3 parcels
- Transport noise sector
- 3 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 503 parcels
- Railways
- 235 parcels
- Power lines
- 160 parcels
- Nature reserve
- 21 parcels
- Loire and its tributaries
- 12 parcels
- Listed or classified site
- 2 parcels
- Remarkable heritage site
- 1 parcel
Addresses
1,782 addresses on 81 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 1 (very low)
- Radon potential
- Category 1 (low)
- Clay shrink-swell
- 78% of the parcels' area with high exposure, 22% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 256 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)