- Parcels
- 2,466
- Cadastral sections
- 10
- Recorded area (contenance)
- 1,151.7 ha
- Commune code (INSEE)
- 38540
Sections
- Section A113 parcels
- Section B688 parcels
- Section C146 parcels
- Section D356 parcels
- Section AB172 parcels
- Section AC91 parcels
- Section AD448 parcels
- Section AE112 parcels
- Section AH153 parcels
- Section AI187 parcels
Planning
- Planning document
- Intermunicipal zoning plan (PLUi) (200040715_PLUI_20260305)
PLU zones (share of parcel area):
- Natural and forest zone (N) (76%)
- Urban zone (U) (13%)
- Agricultural zone (A) (11%)
- Closed development zone (AUs) (0%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Development guidelines (OAP) and Parking.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Utility connections
- 1,220 parcels
- Retail diversity to protect or develop
- 517 parcels
- Social housing quota sector
- 431 parcels
- Protected built or landscape heritage
- 260 parcels
- Ecological corridor (green and blue network)
- 165 parcels
- Reserved site
- 92 parcels
- Other prescription
- 22 parcels
- Building restricted (environment, risks, public interest)
- 17 parcels
- Classified woodland (EBC)
- 4 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Other information
- 735 parcels
- Joint development zone (ZAC)
- 3 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 743 parcels
- Power lines
- 99 parcels
- Watercourse maintenance access
- 55 parcels
Addresses
655 addresses on 64 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 4 (medium)
- Radon potential
- Category 2 (low, with geological factors that can ease the transfer of radon)
- Clay shrink-swell
- 46% of the parcels' area with medium exposure, 34% low
- Risk prevention plan
- Natural or mining risk plan (PM1): 2,380 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
- Technological risk plan (PM3): 128 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)