- Parcels
- 3,225
- Cadastral sections
- 7
- Recorded area (contenance)
- 989.4 ha
- Commune code (INSEE)
- 34155
Sections
- Section A1,426 parcels
- Section B504 parcels
- Section C555 parcels
- Section D301 parcels
- Section E125 parcels
- Section F199 parcels
- Section G115 parcels
Planning
- Planning document
- Local zoning plan (PLU) (34155_PLU_20250123)
PLU zones (share of parcel area):
- Agricultural zone (A) (61%)
- Natural and forest zone (N) (26%)
- Development zone (AUc) (5%)
- Urban zone (U) (5%)
- Closed development zone (AUs) (3%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Reserved site
- 122 parcels
- Other prescription
- 60 parcels
- Buildings in a farm or natural zone
- 48 parcels
- Utility connections
- 21 parcels
- Road, path or public transport to keep or create
- 19 parcels
- Building restricted (environment, risks, public interest)
- 17 parcels
- Development guidelines (OAP)
- 9 parcels
- Protected built or landscape heritage
- 7 parcels
- Classified woodland (EBC)
- 3 parcels
- Ecological corridor (green and blue network)
- 3 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Transport noise sector
- 886 parcels
- Overall development programme
- 234 parcels
- Other information
- 211 parcels
- Joint development zone (ZAC)
- 118 parcels
- Deferred development zone (ZAD)
- 39 parcels
- Archaeological site
- 32 parcels
- Urban pre-emption right
- 5 parcels
- Development tax sector
- 5 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 564 parcels
- Railways
- 140 parcels
- Power lines
- 7 parcels
Addresses
1,160 addresses on 87 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 2 (low)
- Radon potential
- Category 1 (low)
- Clay shrink-swell
- 36% of the parcels' area with high exposure, 64% medium
- Risk prevention plan
- Natural or mining risk plan (PM1): 3,225 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)