- Parcels
- 3,278
- Cadastral sections
- 13
- Recorded area (contenance)
- 1,087.2 ha
- Commune code (INSEE)
- 26271
Sections
- Section AE466 parcels
- Section AH111 parcels
- Section ZA138 parcels
- Section ZB272 parcels
- Section ZC255 parcels
- Section ZD141 parcels
- Section ZE187 parcels
- Section ZH480 parcels
- Section ZI799 parcels
- Section ZL198 parcels
- Section ZM140 parcels
- Section ZN52 parcels
- Section ZO39 parcels
Planning
- Planning document
- Local zoning plan (PLU) (26271_PLU_20220620)
PLU zones (share of parcel area):
- Agricultural zone (A) (56%)
- Natural and forest zone (N) (28%)
- Urban zone (U) (13%)
- Development zone (AUc) (2%)
- Closed development zone (AUs) (1%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Building restricted (environment, risks, public interest)
- 657 parcels
- Building placement rules
- 300 parcels
- Development guidelines (OAP)
- 290 parcels
- Social housing quota sector
- 259 parcels
- Classified woodland (EBC)
- 53 parcels
- Protected built or landscape heritage
- 48 parcels
- Reserved site
- 28 parcels
- Building rights bonus
- 6 parcels
- Protected for its soil or subsoil resources
- 5 parcels
- Other prescription
- 5 parcels
- Buildings in a farm or natural zone
- 1 parcel
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Cover more than 90% of the parcels: Sanitation and waste.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Urban pre-emption right
- 2,045 parcels
- Transport noise sector
- 1,203 parcels
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 464 parcels
- Railways
- 142 parcels
- Power lines
- 56 parcels
Addresses
1,838 addresses on 149 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 3 (significant)
- Clay shrink-swell
- 100% of the parcels' area with medium exposure
- Risk prevention plan
- Natural or mining risk plan (PM1): 592 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)