- Parcels
- 2,990
- Cadastral sections
- 10
- Recorded area (contenance)
- 628.2 ha
- Commune code (INSEE)
- 14167
Sections
- Section AA263 parcels
- Section AV164 parcels
- Section BA23 parcels
- Section BB314 parcels
- Section BC364 parcels
- Section BD300 parcels
- Section BE105 parcels
- Section BH371 parcels
- Section BI624 parcels
- Section BK462 parcels
Planning
- Planning document
- Local zoning plan (PLU) (14167_PLU_20250925)
PLU zones (share of parcel area):
- Urban zone (U) (56%)
- Agricultural zone (A) (21%)
- Development zone (AUc) (12%)
- Closed development zone (AUs) (7%)
- Natural and forest zone (N) (3%)
Zoning plan statistics: prescriptions, information areas and easements
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Development guidelines (OAP)
- 1,554 parcels
- Protected built or landscape heritage
- 704 parcels
- Building placement rules
- 500 parcels
- Building restricted (environment, risks, public interest)
- 41 parcels
- Classified woodland (EBC)
- 18 parcels
- Road, path or public transport to keep or create
- 15 parcels
- Reserved site
- 12 parcels
- Rebuilding or demolition rules
- 5 parcels
- Other prescription
- 4 parcels
- Parking requirements of the mobility plan
- 3 parcels
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Urban pre-emption right
- 2,151 parcels
- Transport noise sector
- 860 parcels
- Joint development zone (ZAC)
- 685 parcels
- Archaeological site
- 323 parcels
- Deferred development zone (ZAD)
- 242 parcels
- Other information
- 202 parcels
- Sanitation and waste
- 1 parcel
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Parcels of the commune concerned, according to the Géoportail de l'Urbanisme:
- Listed monument and its surroundings
- 206 parcels
- Power lines
- 32 parcels
Addresses
2,363 addresses on 172 streets, from the Base Adresse Nationale (national address register). Each number links to its parcel when it is known.
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
- Seismic zone
- Zone 2 (low)
- Radon potential
- Category 1 (low)
- Clay shrink-swell
- 8% of the parcels' area with medium exposure, 61% low
- Risk prevention plan
- Natural or mining risk plan (PM1): 86 parcels within a perimeter recorded in the Géoportail de l'Urbanisme
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Property prices
Loading prices…
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)