Parcel 69389 000 AV 116
Lyon 9e Arrondissement (69389), section AV
- Recorded area
- 1,298 m²
- PLU zone
- UEi1Urban zone (U)
Source datasets used on this page: 6. Their dates and reuse terms can differ.
Sources and versions used on this page
- Plan cadastral informatisé (Etalab)
2026-06-01— Licence Ouverte / Open Licence 2.0 - Géoportail de l’Urbanisme (zonage, prescriptions et informations des PLU, servitudes d’utilité publique)
2026-08-15— Licence Ouverte / Open Licence 2.0 - Base Adresse Nationale (listes d’adresses et géocodage Géoplateforme)
2026-10-07— Licence Ouverte / Open Licence 2.0 - Exposition au retrait-gonflement des argiles
2026-07-02— Licence Ouverte / Open Licence 2.0 - Zonage sismique de la France (décret n° 2010-1255), liste version janvier 2015
2018-07-30— Licence Ouverte / Open Licence 1.0 - Potentiel radon des communes (arrêté du 27 juin 2018)
2019-05-06— Licence Ouverte / Open Licence 1.0
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)
Understanding the map information
- Cadastre and boundary surveys: where does the land end?
- Reading a PLU: a zone label does not define a project
- Recorded and calculated parcel area: why two figures?
- Property risks: from a map finding to a proper check
PLU zoning
UEi1 – Urban zone (U)
Built-up or serviced area. Building is generally allowed, under the PLU rules.
100% of the parcel
Document: 200046977_PLUI_20260326
Addresses
No address from the Base Adresse Nationale is linked to this parcel.
All addresses in Lyon 9e Arrondissement
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
- Building restricted (environment, risks, public interest)
- Risque d inondation par ruissellement-ZONE PRODUCTION – 100% of the parcel
- Social housing quota sector
- Secteur de mixite sociale – 100% of the parcel
- Minimum dwelling size
- Secteur de taille minimale des logements-1 – 100% of the parcel
- Parking
- Secteur de stationnement-C – 100% of the parcel
- Height
- Hauteur Max-13 – 95% of the parcel
- Building placement rules
- Marge de recul – 5% of the parcel
- Building restricted (environment, risks, public interest)
- AXERUI-De vigilance – line on the parcel or its boundary
See the document on the Géoportail de l'Urbanisme
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
- Transport noise sector
- Zone d exposition au bruit – 100% of the parcel
- Sanitation zoning
- Zone d assainissement-COLLECTI – 100% of the parcel
See the document on the Géoportail de l'Urbanisme
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Not recorded in the Géoportail de l'Urbanisme
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.
- Clay shrink-swell
- Medium exposure (100% of the parcel)
- Risk prevention plan
- Not recorded in the Géoportail de l'Urbanisme
- Seismic zone
- Not recorded
- Radon potential
- Category 3 (significant)
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Details
- Cadastral reference
- 69389 000 AV 116 (69389000AV0116)
- Commune
- Lyon 9e Arrondissement (69389)
- Prefix
- 000
- Section
- AV
- Number
- 116
- Recorded area (contenance)
- 1,298 m²
- Computed area
- 1,296 m² Computed from the plan, may differ from the recorded area.
Planning in this commune
- Planning document
- Intermunicipal zoning plan (PLUi) (200046977_PLUI_20260326)
PLU zones (share of parcel area):
- Urban zone (U) (82%)
- Natural and forest zone (N) (17%)
- Agricultural zone (A) (1%)
Neighbouring parcels
- 69389 000 AV 17 – 16 Rue Saint Simon, 69009 Lyon 9e Arrondissement
- 69389 000 AV 32 – 46 Rue Laure Diébold, 69009 Lyon 9e Arrondissement
- 69389 000 AV 33 – 4 Impasse des Jardins, 69009 Lyon 9e Arrondissement
- 69389 000 AV 64
- 69389 000 AV 66
- 69389 000 AV 67
- 69389 000 AV 69
- 69389 000 AV 73
- 69389 000 AV 98
- 69389 000 AV 99
- 69389 000 AV 100
- 69389 000 AV 111
- 69389 000 AV 113
- 69389 000 AV 114
- 69389 000 AV 115
Previous parcel: 69389 000 AV 115