24 Avenue du Général de Gaulle, 67190 Mutzig
Parcel 67313 000 12 175 · section 12
- Recorded area
- 1,490 m²
- PLU zone
- UbUrban zone (U)
Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked
The cadastre is a tax record: it does not prove ownership. Why?
The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)
Understanding the map information
- Cadastre and boundary surveys: where does the land end?
- Reading a PLU: a zone label does not define a project
- Recorded and calculated parcel area: why two figures?
- Property risks: from a map finding to a proper check
PLU zoning
Ub – Urban zone (U)
Built-up or serviced area. Building is generally allowed, under the PLU rules.
100% of the parcel
Document: 67313_PLU_20260224
Addresses
Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.
- 24 Avenue du Général de Gaulle, 67190 Mutzig
Local plan prescriptions
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
Not recorded in the Géoportail de l'Urbanisme
Local plan information
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
- Urban pre-emption right
- Droit de préemption urbain à Mutzig – 100% of the parcel
- Transport noise sector
- Classement sonore – 100% of the parcel
See the document on the Géoportail de l'Urbanisme
Public-utility easements
For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.
- Railways
- SUP T1 du Bas-Rhin – 69% of the parcel
- Listed monument and its surroundings
- Porte de la Ville (ancienne) – 62% of the parcel
Documents on the Géoportail de l'Urbanisme: document 1, document 2
Buildings
Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.
- On the parcel
- 3 buildings
- Use
- Residential, outbuilding
- Height to the eaves
- up to 12.4 m
- Storeys
- up to 4 (ground floor included)
- Dwellings
- 12
- Built
- 1901 – 1999
Risks
This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.
Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.
- Clay shrink-swell
- Low exposure (100% of the parcel)
- Risk prevention plan
- Natural or mining risk plan (PM1) – 9% of the parcel
- Seismic zone
- Zone 3 (moderate)
- Radon potential
- Category 1 (low)
Produce the risk statement (ERRIAL) on GéorisquesRisks near an address (Géorisques)
Details
- Cadastral reference
- 67313 000 12 175 (67313000120175)
- Commune
- Mutzig (67313)
- Prefix
- 000
- Section
- 12
- Number
- 175
- Recorded area (contenance)
- 1,490 m²
- Computed area
- 1,483 m² Computed from the plan, may differ from the recorded area.
Planning in this commune
- Planning document
- Local zoning plan (PLU) (67313_PLU_20260224)
PLU zones (share of parcel area):
- Natural and forest zone (N) (62%)
- Urban zone (U) (19%)
- Agricultural zone (A) (15%)
- Development zone (AUc) (4%)
- Closed development zone (AUs) (1%)
Neighbouring parcels
- 67313 000 12 160
- 67313 000 12 176 – 24A Avenue du Général de Gaulle, 67190 Mutzig
- 67313 000 12 203
- 67313 000 12 335 – 22 Avenue du Général de Gaulle, 67190 Mutzig
Previous parcel: 67313 000 12 174Next parcel: 67313 000 12 176 – 24A Avenue du Général de Gaulle, 67190 Mutzig