CarteparcelleMapFrançais

Parcel 54112 000 AC 95

Chambley-Bussières (54112), section AC

Recorded area
90 m²
PLU zone
UAB-8Urban zone (U)
54112 000 AC 8954112 000 AC 9054112 000 AC 9154112 000 AC 9254112 000 AC 9354112 000 AC 9454112 000 AC 9554112 000 AC 9654112 000 AC 9754112 000 AC 15154112 000 AC 15354112 000 AC 22954112 000 AC 23054112 000 AC 27254112 000 AC 29454112 000 AC 295
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UAB-8 – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 200070738_PLUi_20260305

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Chambley-Bussières

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Other information
Existence de risques (cf : plan des risques naturels, plans des SUP relatives à la sécurité publique) – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

Details

Cadastral reference
54112 000 AC 95 (54112000AC0095)
Commune
Chambley-Bussières (54112)
Prefix
000
Section
AC
Number
95
Recorded area (contenance)
90 m²
Computed area
90 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (200070738_PLUI_20260305)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 54112 000 AC 94 – 7 Rue de la Gare, 54890 Chambley-BussièresNext parcel: 54112 000 AC 96 – 10 Rue des Chevaux, 54890 Chambley-Bussières