CarteparcelleMapFrançais

Parcel 51101 000 ZC 184

Caurel (51101), section ZC

Recorded area
2.1 ha
PLU zone
AAgricultural zone (A)
51101 000 ZC 2951101 000 ZC 3051101 000 ZC 10351101 000 ZC 10451101 000 ZC 11151101 000 ZC 11251101 000 ZC 11351101 000 ZC 11451101 000 ZC 11551101 000 ZC 11651101 000 ZC 11751101 000 ZC 11851101 000 ZC 11951101 000 ZC 12051101 000 ZC 12151101 000 ZC 12251101 000 ZC 12551101 000 ZC 12651101 000 ZC 12751101 000 ZC 12851101 000 ZC 12951101 000 ZC 13051101 000 ZC 13151101 000 ZC 18251101 000 ZC 18351101 000 ZC 184
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

PLU zoning

A – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel
Document: 51101_PLU_20250315

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Plan Pluie - zone INF-02 – 65% of the parcel
Sanitation zoning
Plan Pluie - zone INF-01 – 35% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Eglise Saint-Basle – 49% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Not recorded
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

Details

Cadastral reference
51101 000 ZC 184 (51101000ZC0184)
Commune
Caurel (51101)
Prefix
000
Section
ZC
Number
184
Recorded area (contenance)
2.1 ha Contenance arpentée (measured on site).
Computed area
2.1 ha Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (51101_PLU_20250315)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 51101 000 ZC 183Next parcel: 51101 000 ZC 185