CarteparcelleMapFrançais

1 Rue de la Mairie, 44390 Puceul

Parcel 44138 000 AB 165 · section AB

Recorded area
283 m²
PLU zone
UAUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

44138 000 AB 11944138 000 AB 12044138 000 AB 12344138 000 AB 14744138 000 AB 14844138 000 AB 14944138 000 AB 15044138 000 AB 15944138 000 AB 16044138 000 AB 16244138 000 AB 16344138 000 AB 16444138 000 AB 16544138 000 AB 16644138 000 AB 16944138 000 AB 17244138 000 AB 17344138 000 AB 17644138 000 AB 21044138 000 AB 32244138 000 AB 32344138 000 AB 32444138 000 AB 34544138 000 AB 34644138 000 AB 34844138 000 AB 34944138 000 AB 35044138 000 AB 35144138 000 AB 35244138 000 AB 35344138 000 AB 35444138 000 AB 35544138 000 AB 35644138 000 AB 35744138 000 AB 36044138 000 AB 36244138 000 AB 36944138 000 AB 37044138 000 AB 37144138 000 AB 37544138 000 AB 38944138 000 AB 39144138 000 AB 39344138 000 AB 39644138 000 AB 39744138 000 AB 42044138 000 AB 42144138 000 AB 44644138 000 AB 44744138 000 AB 45244138 000 AB 45344138 000 AB 45444138 000 AB 48244138 000 AB 48344138 000 AB 484
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UA – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

63% of the parcel
Document: 244400537_PLUI_20251015

UB – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

37% of the parcel
Document: 244400537_PLUI_20251015

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Puceul

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Retail diversity to protect
Linéaire commercial protégé au titre du L151-16 du CU – line on the parcel or its boundary

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
1 building
Height to the eaves
6.3 m

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 2 (low)
Radon potential
Category 1 (low)

Details

Cadastral reference
44138 000 AB 165 (44138000AB0165)
Commune
Puceul (44138)
Prefix
000
Section
AB
Number
165
Recorded area (contenance)
283 m²
Computed area
258 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (244400537_PLUI_20251015)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 44138 000 AB 164 – 3 Rue de la Mairie, 44390 PuceulNext parcel: 44138 000 AB 166